My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/25/1993
CBCC
>
Meetings
>
1990's
>
1993
>
5/25/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:53 PM
Creation date
6/16/2015 1:07:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/25/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Utilities and Services <br />The site is within the Urban Service Area o county Water Plant. <br />extend to the site from theY <br />Wastewater lines extend to the site from the City of Vero Beach <br />Wastewater Plant. <br />Transportation System <br />The property abuts Old Dixie Highway to the east, 9th Street to the <br />north, and 8th Street to the south. Old Dixie Highway is <br />classified as a collector road on the future roadway thoroughfare <br />plan map. This segment of Old Dixie Highway is a two-lane paved <br />road with approximately 80 feet of existing public road right-of- <br />way. Old Dixie Highway is programmed for expansion to four lanes <br />and 100 feet of public road right-of-way by 1995. Eighth Street is <br />classified as a collector road on the future roadway thoroughfare <br />plan map. This segment of 8th Street is a two-lane paved road with <br />approximately 80 feet of existing public road right-of-way. Ninth <br />Street is a two-lane paved local road with approximately 60 feet of <br />existing public road right-of-way. <br />The northern -most property also abuts 10th Avenue which is a two- <br />lane unpaved local road with approximately 70 feet of existing <br />public road right-of-way. _ <br />ANALYSIS <br />In this section, an analysis of the reasonableness of the <br />application will be presented. The analysis will address <br />• concurrency of public facilities; <br />• consistency with the comprehensive plan; <br />• compatibility with the surrounding area; <br />• potential impact on environmental quality; <br />• appropriateness of the C/I land use designation; and <br />• DCA objections. <br />This section will also discuss the Board of County Commissioners' <br />alternatives. <br />Concurrency of Public Facilities <br />This site is located within the county Urban Service Area, an area <br />deemed suited for urban scale development. -The Comprehensive Plan <br />establishes standards for: Transportation, Potable Water, <br />Wastewater-, Solid Waste, Drainage and Recreation (Future Land Use <br />Policy 3.1). The adequate provision of these services is necessary <br />to ensure the continued quality of life enjoyed by the community. <br />The Comprehensive Plan and Land -Development Regulations also <br />require that new development be reviewed to ensure that the minimum <br />acceptable standards for these- services and facilities are <br />maintained. <br />Policy 3.2 of the Future Land Use Element states that no <br />development -shall be approved unless it is consistent with the <br />concurrency management system component of the Capital Improvements <br />Element. For Comprehensive Plan amendment and rezoning requests, <br />conditional concurrency review is required. <br />Conditional concurrency review examines the available capacity of <br />each facility with respect to a proposed project. Since <br />Comprehensive Plan amendment and rezoning requests are not <br />projects, county regulations call for the concurrency review to be <br />17 <br />L.._MAY 251993 NOOK 89 Facc'f s <br />
The URL can be used to link to this page
Your browser does not support the video tag.