My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/20/1993
CBCC
>
Meetings
>
1990's
>
1993
>
7/20/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:54 PM
Creation date
6/16/2015 1:06:11 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/20/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO: James Chandler <br />County Administrator <br />THROUGH: James W. Davis, P.E. <br />Public Works Director <br />FROM: Robert Zaitooni, P.E. <br />County Traffic Engine <br />SUBJECT: Consultant Fee <br />Design of Left -Turn Bays and Related Drainage Design <br />Intersection of SR 60 at 82nd Avenue <br />DATE: July 13, 1993 <br />DESCRIPTION AND CONDITIONS <br />Mosby and Associates, Inc., is presently under contract with the Gator <br />Truck Stop (located at the Southwest corner of 82nd Avenue and SR 60) to <br />design the 82nd Avenue widening south of SR 60 as required by County as <br />a part of their off-site improvements. These improvements are paid for <br />by the Developer. In addition, the Florida Department of Transportation <br />is planning to install a traffic signal at this intersection in the month <br />of July. <br />In accordance with County's permit requirements with Florida Department <br />of Transportation, County is required to design and construct the left - <br />turn lanes on 82nd Avenue. In order to complete this within the same time <br />frame as the other improvements, it is critical to expedite the <br />preparation of plans and drainage design for their improvements. <br />Mosby and Associates has proposed a fee of $3,800 to perform survey work <br />for the southbound left turn lane, prepare the construction plans, <br />drainage design, and obtain the required permits. <br />ALTERNATIVES AND ANALYSIS <br />Alternatives are as follows: <br />Alternative No. 1 <br />Approve the requested $3,800 design fee for Mosby and Associates. <br />Alternative No. 2. <br />County staff prepare the plans and perform the drainage design. <br />Alternative No. 3. <br />Advertise the work through the competition process. <br />RECOMMENDATIONS AND FUNDING <br />Because of the critical time frame staff recommends approval of <br />Alternative No. 1. Funding will be from County account <br />#101-'158-541-067.62 <br />2`3 <br />L_ JUL 201993 800K 90 PAGE 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.