My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/10/1993
CBCC
>
Meetings
>
1990's
>
1993
>
8/10/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:54 PM
Creation date
6/16/2015 1:14:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/10/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$117,378.18 <br />- 30,453=.49 <br />$ 86,924.69 <br />less a nonassessed portion of construction and <br />engineering* <br />Total estimated cost to be assessed to property <br />owners <br />The cost per square foot is $0.14210695047. This project is to be <br />funded through the assessment of property owners along the proposed <br />gravity sewer route. In the interim, financing will be through the <br />use of impact fee funds. <br />* This portion of the construction is to be paid for from the <br />impact fee fund, as it runs past properties already served by <br />sewer (i.e., the existing lift station this project ties into). <br />RECOMMEENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve the attached Resolutions, <br />which approve the preliminary assessment roll and establish the <br />public hearing date. <br />Utility Services Director Terry Pinto explained that this <br />project was part of the expansion of wastewater service out SR -60 <br />beyond I-95. Because we could not readily service both sides of <br />the road with the force main, the gravity sewer collection system <br />was designed to service the north side of the road. The County has <br />the option of handling this project without an assessment, and <br />Director Pinto recommended that we table it for now in order to <br />give it more thought. <br />ON MOTION by Commissioner Macht, SECONDED by <br />Commissioner Eggert, the Board unanimously <br />authorized staff to bring this back at a later date, <br />if it should become feasible. <br />WATER EXPANSION PLAN - PHASE II. CONTRACT A - CHANGE ORDER NO. 1 <br />AND FINAL PAY REQUEST <br />The Board reviewed the following memo dated August 2, 1993: <br />35 <br />AUG 10 <br />1993 BOOK 90 PA"IF 183 <br />
The URL can be used to link to this page
Your browser does not support the video tag.