My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/17/1993
CBCC
>
Meetings
>
1990's
>
1993
>
8/17/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:54 PM
Creation date
6/16/2015 1:15:43 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/17/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Department has negotiated the attached Work Authorization No. <br />1 (copy attached) under the Master Agreement to address the above <br />needs. The Work Authorization No. 1 will be composed of five <br />tasks as follows: <br />Task 1: <br />Task 2: <br />Task 3: <br />Task 4: <br />Task 5: <br />RECOMMENDATION: <br />Collect Data <br />Impott Fee Data <br />Septage Rate Data <br />Reuse Data <br />Impact Fees <br />$1,646.00 <br />1,646.00 <br />1,682.00 <br />Prelim Fee Calculations $3,018.00 <br />Prelim Line Ext. Fees 1,317.00 <br />Finalize Rate/Fee Calcs 21193.00 <br />Septage Rates <br />$4,974.00 <br />$6,528.00 <br />Septage Cost Analysis $1,430.00 <br />Septage Rate Design 482.00 <br />Septage Rate Revision 11017.00 $2,929.00 <br />Reuse Rates <br />Prelim Reuse Calcs $6,724.00 <br />Finalize Reuse Water 4,235.00 $10,959.00 <br />Present Results <br />Draft Report $6,626.00 <br />Final Report 3,535.00 <br />Present Results 41243.00 $14,404.00 <br />Total Cost: $39,794.00 <br />The staff of the Department of Utility Services recommends the <br />Board of County Commissioners' approval of the attached Work <br />Authorization No. 1 --Update of Impact Fees, Development of <br />Wastewater Reuse Rates, and Calculation of Septage Rates --and <br />authorize execution of Work Authorization No. 1. <br />Commissioner Adams had a serious problem with not doing the <br />rate structure in-house and saving $40,000, especially since some <br />of these figures are only two years old. <br />Utilities Director Terry Pinto explained that staff is geared <br />to handle the everyday needs of the operating utility. It has been <br />the requirement in the past to have someone from the outside to <br />come in and analyze these numbers to give an assurance of an <br />independent look at what the needs are in the county. <br />57 <br />Boo!( 90 F,;r �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.