Laserfiche WebLink
M M <br />In accordance with the master plan, creating a reuse water supply <br />for golf course irrigation is the highest priority for the primary <br />effluent disposal method. <br />The proposed Central Reuse water system is described as follows: <br />Rapid infiltration basins at Bent Pine will have a capacity of 14 <br />million gallons and act as a central receiving site backup system. <br />The reuse water transmission which services Sandridge is presently <br />interconnected with reuse water transmission which services Hawk's <br />Nest, Grand Harbor, and Bent Pine Golf Courses. The overflow reuse <br />water from all golf courses, when they are unable to receive water, <br />shall be directed to the central receiving site at Bent Pine. In <br />order to recover some of the water in the rapid infiltration basins, <br />a pumping system must be added to the system, to enable the <br />reinjection of reuse water back into the reuse system. <br />ANALYSIS: <br />Professional Engineering Consultants, Inc., Orlando, Florida, the <br />primary consultant of the project, has preliminarily designed and <br />estimated the cost of the pumping station, including a ten percent <br />contingency, for a total amount of $224,400.00. The negotiated <br />consultant fee for design, construction administration, and <br />inspection is derived from the original agreement, in accordance <br />with the FmHA percentages guidelines. <br />The professional engineering fees are described in the attached <br />letter dated August 12, 1993, Page 2, Attachment A, Section 4. <br />1. Preparation of Process and Instrumentation <br />Diagram (P&ID), and function description <br />of the Central Reuse Pumping System $ 1,000.00 <br />2. Design services; lump sum fixed fee, based <br />on FmHA percentage of construction cost used <br />in original agreement <br />(5.9% X $224,400 - rounded up) 13,240.00 <br />3. Resident Project Services; based on <br />FmHA percentage of total construction <br />cost used in original agreement <br />(1.95% X $224,400 - rounded up) 4.376.00 <br />Total to be approved for professional services: $18,616.00 <br />Funding for this project would be from the impact fee fund. Upon <br />the completion of design, the Department of Utility Services will <br />negotiate with the existing contractor, Speegle Contracting, Inc., <br />Cocoa, Florida, for a change order, which will be brought to the <br />Board of County Commissioners for approval. <br />RECOMMENDATION: <br />The Department of Utility Services recommends the following: <br />1. Approval of Addendum No. 1 to the agreement, Work <br />Authorization No. 2, with Professional Engineering <br />Consultants, Inc. <br />2. Authorization for the Chairman of the Board of County <br />Commissioners to execute Addendum No. 1, Work <br />Authorization No. 2. <br />37 <br />BOOK 90 FADE �P � <br />