My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/18/1994
CBCC
>
Meetings
>
1990's
>
1994
>
1/18/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:04:23 PM
Creation date
6/16/2015 1:41:53 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/18/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEVELOPER'S AGREEMENT FOR UTILITIES - WAL-MART STORE, NORTH COUNTY <br />The Board reviewed the following memo dated 1/6/93: <br />DATE: <br />TO: <br />FROM: <br />PREPARED <br />AND STAFFED <br />BY: <br />SUBJECT: <br />BACKGROUND <br />JANUARY 6, 1993 <br />JAMES E. CHANDLER <br />COUNTY ADMINISTRA <br />TERRANCE G. <br />DIRECTOR OF <br />JOSE R. DIAZ <br />PRIVATE PROD <br />CES <br />VS ENGINEER <br />UTILITY SERVICES <br />AGREEMENT BETWEEN INDIAN RIVER COUNTY AND WAL-MART <br />STORE, INC., NORTH COUNTY <br />INDIAN RIVER COUNTY PROJECT NO. CDS-CCS-475 <br />On December 7, 1993, the Board of County Commissioners approved an <br />agreement between Indian River County, a political subdivision of the <br />State of Florida, 1840 25th Street, Vero Beach, Florida 32960 (County) <br />and the City of Sebastian for water and sewer service as depicted' on <br />the attached inter local agreement. We are now bringing an agreement <br />for the connection of the Wal-Mart retail shopping center to the <br />County's water distribution facility at Roseland Road. The County's <br />Master Plan requirements make it necessary to increase the .diameter of <br />the proposed water lines to implement the Indian River County Potable <br />Water Master Plan. <br />ANALYSIS <br />The proposed utility construction along U.S. Highway ,#1 will <br />necessitate the construction of the following water mains. <br />Approximately 3662 linear feet of 16" diameter and 216 linear feet of <br />10" diameter at* the on-site and off-site of the mentioned shopping <br />center. The estimated cost of this construction is $194,633.35, (see <br />Attachment A). This amount shall be reimbursed by the County to the <br />Developer. Funding to cover this construction will be from the impact <br />fees fund. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve the above-mentioned developer's <br />agreement with Wal-Mart Stores, Inc. <br />11"Tul-11163M 11 <br />MOTION WAS MADE by Commissioner Eggert, SECONDED by <br />Commissioner Macht, that the Board approve the <br />Agreement with Wal-Mart Stores, Inc. for the <br />provision of water and sewer service to the store <br />located in Sebastian, as recommended by staff. <br />23 <br />BOOK 91 FA .552 <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.