Laserfiche WebLink
e <br />FEB 15 1994, Boor 71 FSG( 75.0 <br />ENGINEERING CONSULTING SERVICES FOR WATER EXPANSION PLAN — PHASE V <br />14ASTELLER & MOLER. INC. <br />The Board reviewed the following memo dated 2/4/94: <br />DATE: FEBRUARY 4, 1994 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRA' <br />FROM: TERRANCE G. <br />PREPARED H . D , Pte. <br />AND STAFFED ENVIRONMENTAL ENGINEER <br />BY: DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: ENGINEERING CONSULTING SERVICES FOR WATER EXPANSION <br />PLAN - PHASE V <br />INDIAN RIVER COUNTY PROJECT NO. UW -93 -33 -DS <br />BACKGROUND <br />On September 28, 1993, the Board of County Commissioners approved the <br />continuing services agreement for design and construction inspection of <br />water and wastewater construction projects. It further authorized the <br />Department of Utility Services to negotiate with the consulting firms <br />to provide the required services. <br />ANALYSIS <br />The work authorization to provide engineering consulting services for <br />Phase V of the Water Expansion Plan (IRC Project No. UW -93 -33 -DS) is <br />attached. Masteller and Moler, Inc., was selected for this phase which <br />includes water service to approximately 1,092 homeowners on 1,495 lots <br />in Glendale Park, Oslo Park (including units 3 through 7), and <br />Grovernor Estates. <br />The total consultants fee is $190,000.00 for design services and shall <br />include surveying, preliminary reports, design, inspection, assessment <br />roll preparation, and submittal of record drawings (prints, mylars and <br />digital copies). <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends approval of <br />the attached work authorization so that we can proceed with the design <br />of the Phase V project. <br />22 <br />