My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/26/1994
CBCC
>
Meetings
>
1990's
>
1994
>
4/26/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:04:24 PM
Creation date
6/16/2015 2:02:20 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/26/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APR 26 1994 <br />BACKGROUND: <br />ROOK 92 u l; 262 <br />At its April 12, 1994 meeting the Board of County Commissioners <br />considered a request by St. Edwards for special exception use and <br />conceptual Zlan approval to use 121 lots that presently lie within <br />Sandpointe West subdivision to expand its existing upper school <br />facility. At that meeting, the applicant distributed to staff and <br />to some of the Sandpointe West property owners a revised conceptual <br />plan. This revised plan, although substantially similar to the <br />reviewed plan, depicted changes in building location and imposed <br />more design restrictions than proposed under the reviewed plan. <br />The Board of County Commissioners opened the public hearing, <br />considered the application requests and the newly proposed <br />conceptual plan, and took public comments. The Board of County <br />Commissioners then acted to table the application to a time certain <br />(April 26, 1994) in order to give all parties a chance to <br />reconsider their positions and review the revised conceptual plan. <br />Staff has now reviewed the revised conceptual plan. While the <br />revised conceptual design plan sheet itself lacks much of the <br />required conceptual plan technical information (site data, etc.), <br />staff considered this revised plan sheet as an amendment to the <br />original plan set and has reviewed it for design purposes only. <br />Staff has considered only the design elements modified by the <br />revised plan to be the subject of review. Staff used the technical <br />information on the initial conceptual plan to support this revised <br />plan sheet. <br />The Board of County Commissioners <br />conceptual plan, and is to take <br />exception use and conceptual plan <br />ANALYSIS: <br />is now to consider the amended <br />final action on the special <br />approval requests. <br />In staff's opinion, the revised design is not a substantial change <br />from the original conceptual plan submittal. If the applicant had <br />obtained conceptual approval of the initial submittal, then a <br />design similar to the revised conceptual plan could have been <br />submitted for major site plan approval and construction. Staff <br />would have deemed the.major site plan application consistent with <br />the approved conceptual plan, since the design of the revised <br />conceptual plan is consistent with the initial conceptual plan. <br />Generally, the revised design impacts fewer Sandpointe West lots <br />with the placement of buildings, has less building mass within 50' <br />of the property line, and proposes fewer parking spaces. The <br />design also restricts the structures to one story, breaks -up the <br />structure into more of a campus courtyard design, and provides <br />buildings that are closer to a residential scale. <br />.Briefly listed below is a plan comparison <br />elements that have changed from the initial <br />-- recently proposed revised plan: <br />Initial Plan <br />Setbacks (north 50' <br />side) <br />Building Height: _ 2 story <br />Number of Parking <br />Spaces: 230 spaces <br />Building Area: 24,700 sq. ft. <br />Roof type: �. no resttiction <br />10 <br />of the major design <br />conceptual plan to the <br />Revised Plan <br />50' to 70' <br />(majority of <br />building area: <br />62-) <br />1 story, <br />220 spaces <br />24,000 sq. ft. <br />restricted to sloped <br />roof treatment <br />® M <br />
The URL can be used to link to this page
Your browser does not support the video tag.