My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/10/1994
CBCC
>
Meetings
>
1990's
>
1994
>
5/10/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:04:24 PM
Creation date
6/16/2015 2:06:04 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/10/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK 92 PAUF 3,90 <br />26th Street exhibits several benefits over the proposed master plan <br />routing; It will better accommodate the proposed mall site, it <br />will provide a secondary source connection to Village Green, Indian <br />River Estates, it will reduce the interconnection distance from <br />State Road 60 at 66th Avenue and 74th Avenue, and it will allow <br />construction of the line prior to road improvements proposed by <br />public works. <br />ANALYSIS <br />We are proposing to design and permit this project with in-house <br />staff, utilizing the existing survey and road way plans from 66th <br />Avenue to 72nd Avenue. Outside survey services will be used for <br />66th Avenue to Kings Highway and from 74th Avenue West to 82nd <br />Avenue, then South to State Road 60. The proposed additional <br />survey services will be by price quotation from our short listed <br />survey firms and not to exceed $10,000. The estimated construction <br />cost is $1,534,000, with engineering and survey costs not to exceed <br />$25,000. The total estimated or budgetary cost is $1,559,000. <br />Funding for this project will be from the impact fee fund. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve the 26th Avenue Water Main <br />Project as presented. <br />ON MOTION by Commissioner Adams, SECONDED by <br />Commissioner Eggert, -the Board unanimously approved <br />the 26th Avenue Water Main Project as presented by <br />staff . <br />I.R. MEMORIAL HOSPITAL WEST PERIMETER ROADWAY <br />The Board reviewed the following memo dated 4/29/94: <br />DATE: APRIL 29, 1994 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATO <br />FROM: TERRANCE G. PINT <br />DIRECTOR OF UTI VICES <br />PREPARED H. D. OSTER, P. E. <br />AND STAFFED ENVIRONMENTAL ENGINEER <br />BY: DEPARTMENT OF UTILITY SER.ICES <br />SUBJECT: INDIAN RIVER MEMORIAL HOSPITAL <br />WEST PERIMETER ROADWAY <br />BACKGROUND <br />The subject roadway construction passes directly over an Indian River <br />County eight inch water main which conflicts with the proposed <br />construction. To alleviate the conflict, -a 120 foot section of our <br />line must be lowered approximately three feet. <br />we <br />
The URL can be used to link to this page
Your browser does not support the video tag.