My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/26/1994
CBCC
>
Meetings
>
1990's
>
1994
>
7/26/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:04:25 PM
Creation date
6/16/2015 2:41:35 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/26/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The attached Change Order No. 1 in the amount of $8,267.23, <br />increases Natureland's contract amount to $23,305.01. The tree <br />grant will fund $21,444 of the contract amount for the planting of <br />172 trees. The County is responsible for funding $1,861.01 for the <br />planting of saw palmettos and ground cover as part of the local <br />match. The remainder of the County's 50/50 local match has already <br />been expended on the installation of irrigation during Round Island <br />Park Phase I Improvements. <br />RECOMMENDATIONS AND FUNDING <br />Staff recommends that the Board approve Change Order No. 1 in the <br />amount of $8,267.23 for a new contract amount of $23,305.01. <br />Funding is from Account No. 001-2'10-572-066.51. <br />ON MOTION by Commissioner Macht, SECONDED by <br />Commissioner Adams, the Board unanimously approved <br />Change Order No. 1 to the contract with Natureland <br />in the amount of $8,267.23 for a new contract amount <br />of $23,305.01, as recommended by staff. <br />CHANGE ORDER NO. 1 <br />IS ON FILE IN THE OFFICE OF CLERK TO THE BOARD <br />STATE ROAD AIA WIDENING AND DRAINAGE UyWROVEMENTS <br />The Board reviewed memo from Capital Projects Manager Terry <br />Thompson dated July 18, 1994: <br />TO: James E. Chandler, <br />-County Administrator <br />THROUGH: James W. Davis, P.E., <br />Public Works Director <br />FROM: Terry B. Thompson.,P.E.�� <br />Capital Projects Manager <br />SUBJECT: <br />SR A1A Widening <br />and Drainage <br />Improvements <br />DATE: <br />July 18, 1994 <br />FILE: <br />SouthAlA.agn/tbt <br />DESCRIPTION AND CONDITIONS <br />Kimley-Horn Associates, Inc. is currently designing improvements on <br />SR AIA from 635' south of Windward Way to Mooringline Drive. The <br />County has requested a proposal from Kimley-Horn to three lane A1A <br />from a point approximately midway between Mooringline Drive and <br />Windward Way north to Harbor Drive. <br />The attached agreement with Kimley-Horn Associates, Inc. provides <br />for survey, design, permitting and preparation of construction <br />drawings for the proposed widening and drainage improvements at a <br />cost of $31,672. <br />53 �'® <br />Oil F�°�'� <br />July 26, 1994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.