Laserfiche WebLink
the intersection of CR 510 and US 1, south to 49th Street. In the <br />original project layout, we were to suspend our water line over an <br />existing DOT bridge across the north relief canal and to proceed <br />through the 510/US 1 intersection. These two areas now have to be <br />modified. We are proceeding with an aerial crossing of the north <br />relief canal, as well as a relocation of the north end of the line <br />to the east of the Wabasso intersection. Both of these require <br />additional survey work. We have negotiated a lump sum fee with our <br />surveyor of $1,950.00 for the additional work (see attached Addendum <br />No. 1 with Masteller, Moler and Reed, Inc.). Funding for this <br />additional work will be from Account No. 472-000-169-219.00. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends approval <br />of Addendum No. 1 with Masteller, Moler and Reed, Inc., in the <br />amount of $1,950.00 as presented. <br />OX MOTION by Commissioner Adams, SECONDED by <br />Commissioner Macht, the Board unanimously <br />approved Addendum No. 1 with Masteller, Mol-er <br />and Reed, Inc., in the amount of $1,950 as <br />recommended by staff. <br />ADDENDUM NO. 1 IS ON FILE IN THE <br />OFFICE OF THE CLERK TO THE BOARD <br />NORTH COUNTY REVERSE OSMOSIS PLANT PHASE H - BRINE <br />DISPOSAL LINE SURVEY SERVICES <br />The Board reviewed the following memo dated October 3, 1994: <br />DATE: October 3, 1994 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATPR- <br />FROM: TERRANCE G. <br />DIRECTOR AWLIYSERVICES <br />PREPARED WILLIAM F. MC I <br />AND STAFFED CAPITAL PRO 9GINEER <br />BY: DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: NORTH COUNTY R.O. PLANT PHASE II <br />BRINE DISPOSAL LINE SURVEY SERVICES <br />INDIAN RIVER COUNTY PROJECT NO. UW -94 -23 -ED <br />BACKGROUND <br />On May 24, 19941 the Indian River County Board of County. <br />Commissioners approved the design and construction of the North <br />County R.O. Plant. (See attached agenda item and minutes). In <br />that agenda, we referenced an upcoming inhouse design project for <br />the plants brine disposal line. We are now prepared to proceed <br />with this project. <br />39 <br />October 11, 1994 BOOK 9.3 PAGE 505 <br />