My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-077
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 1:31:28 PM
Creation date
5/3/2018 1:49:20 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/01/2018
Control Number
2018-077
Agenda Item Number
8.G.
Entity Name
Aptim Environmental & Infrastructure
Subject
Beach and dune renourishment project beach fill
Work order 2018029-1
Area
Sector 5 Vero Beach
Project Number
2018029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APTIM April 11, 2018 <br />` Page 4 of 10 <br />as needed, with submittal assistance and completeness review. Any questions/comments (or RAls) <br />throughout the State's review process of the Draft MHW Survey submittal will be coordinated and addressed <br />by M&E. <br />• APTIM will prepare and publish a notice of the ECL workshop/hearing in a local newspaper once a week for <br />three consecutive weeks prior to the workshop/hearing per the ECL establishment checklist. Proof of the <br />publication will be transmitted to the State's ECL Project Manager. The County will assist by providing the <br />name of the local newspaper. The expense to publish the notification is not included in this Task, and is <br />addressed in the Task 4. <br />• APTIM will prepare and mail public notices of the ECL workshop/hearing to all riparian owners located within <br />1,000 feet of the proposed ECL. Proof of the publication will be transmitted to the State's ECL Project <br />Manager. The County will assist by providing a list or database of addresses of all riparian owners of record. <br />The expense to mail the notifications is not included in this Task, and is addressed in the Task 4. <br />• APTIM will prepare for, attend, and lead the required workshop/hearing. It is assumed that the required <br />workshop and hearing will be conducted together immediately after each other. The ECL workshop/hearing <br />will be.scheduled upon submittal of the final MHW survey. The ECL workshop/hearing is to take place within <br />approximately 6 months of the completion of the MHW survey. M&E will provide the required maps of the <br />MHW line for review during the ECL workshop/hearing. APTIM will prepare a powerpoint presentation for <br />the meeting. The County will assist with identifying a local meeting venue. <br />• APTIM will transmit digital copies of all certified letter receipts, notices, and agendas to the Beaches and Mines <br />Funding Assistance Program Project Manager. <br />• APTIM will assist the County in facilitating post -ECL hearing coordination in finalizing the ECL. It is assumed <br />that M&E will provide the required Mylar copies of the final ECL survey. <br />Task 3: Schedule <br />The ECL workshop/hearing is to take place within approximately 6 months of the completion of the MHW survey. <br />A fixed schedule cannot be provided for this task because it is unclear when the final permits will be issued, when <br />the project can be awarded, and how the County's Contractor's construction schedule will be structured. APTIM <br />will attempt. to execute each phase of the work in as expeditious a manner as possible. <br />Task 3: Cost <br />The lump sum cost for this task is $7,490.00. <br />Task 4: ECL Notification Expenses <br />This Task addresses the expenses to transmit the required notifications of the ECL workshop/hearing. There is no <br />labor associated with this task (labor costs are included in Task 3). APTIM will coordinate with the County before <br />proceeding with expenses associated with this Task. If the County decides to pay directly for the ECL notification <br />expenses, then this Task will not be executed. If APTIM is instructed to proceed with the ECL notification expenses, <br />only the costs incurred will be invoiced to the County. If the costs incurred exceed the amount allocated for this <br />IRC Sector 5 — 2018029 — WO#1: Pre -Construction Services Proj. #631236907 <br />
The URL can be used to link to this page
Your browser does not support the video tag.