My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-077
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 1:31:28 PM
Creation date
5/3/2018 1:49:20 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,AAPTIM April 11, 2018 <br />,Page 6 of 10 <br />approximately 2000 feet apart and seven (7) sediment only transects located in areas where the ETOF comes <br />closest to the hardbottom. All transects will run perpendicular to the shoreline and extend from the nearshore <br />hardbottom edge to a distance of 100 meters seaward. Stainless steel rods will be used to permanently mark the <br />transects to facilitate repeatability for post -construction monitoring. After transect establishment, a biological <br />survey will be conducted to document the pre -construction condition of the hardbottom using quadrat <br />assessments, sediment measurements and video/photo documentation. Additionally, the PEP Reef located near <br />R-81 to R-83, will be qualitatively assessed during this effort. <br />Up to thirteen (13) 0.75-m2 quadrats will be sampled along each transect to quantify the benthic community. <br />Sediment data will be collected using line -intercept and 1-m interval sediment depth measurements, and video <br />documentation will also be collected for the length of each transect. It is anticipated that the effort to delineate <br />the hardbottom edge, install transects and monitor the transects will take up to 12 field days. <br />Pre -construction data will be compiled and incorporated into an interactive GIS database and in situ data will be <br />entered into an Access database. Data entry, reduction, archiving, and analysis time is included in the cost <br />estimate to address the data management and reporting requirements for those 12 days.of field operations. <br />Task 5: Deliverable <br />Raw data will be provided to FDEP and the County within 45 days of completion of the survey. This includes a P.DF <br />of the scanned datasheets, excel spreadsheets with quadrat data, interval sediment depth measurements and <br />line -intercept data, shapefiles of the hardbottom edge survey, video and photo documentation. Additionally, <br />APTIM will provide a map of the project area and adjacent hardbottom resources with the hardbottom edge <br />delineation and monitoring transects overlaid onto recent, clear aerial photographs (in digital format). A report is <br />not proposed for the pre -construction monitoring survey. <br />Task 5: Schedule <br />The pre -construction monitoring event will take place during the summer (May — September) prior to project <br />construction. Raw data from field operations will be submitted to the County and FDEP within 45 days of <br />completion of the survey. <br />Task 5: Cost <br />The lump sum cost for this task is $105,651.95. <br />Task 6: Bidding and Construction Preparation Services <br />Task 6: Scope of Work and Deliverables <br />This task is to provide several required services in preparation for construction of the Sector 5 Beach and Dune <br />Restoration Project. Work for this task primarily consists of in-person meetings, permit agency submittals, and <br />correspondence between APTIM, the County, M&E, FDEP and the Contractor. The County will be included, <br />informed and/or copied on all pertinent correspondences. <br />IRC Sector 5 — 2018029 — WO#1: Pre -Construction Services Proj. #631236907 <br />
The URL can be used to link to this page
Your browser does not support the video tag.