Laserfiche WebLink
.... 7. Recreation Area and Pedestrian Improvements: The proposed project satisfies the PD <br /> ordinance recreation area requirements as follows: <br /> Required Recreation Area: 1.20 acres <br /> Provided Recreation Area: 1.50 acres (includes recreation tract and pedestrian systems) <br /> The PD plan proposes an internal pedestrian system consisting of a 4' wide sidewalk along <br /> one side of the project's internal roadways. Those pedestrian improvements will also <br /> provide access to the project's lakes, which will function as passive park green areas. As <br /> proposed, the recreation/landscape tracts will all be served by the project's internal <br /> pedestrian system, and the internal sidewalk system will connect to an external public <br /> sidewalk to be constructed along 53rd Street. That external public sidewalk will be <br /> constructed by the applicant along the project's 53rd Street right-of-way from the project <br /> entry to the west project boundary. Improvements to the main recreation tract,which may be <br /> used for passive or active recreational uses, will require a future site plan administrative <br /> approval. <br /> 8. Surrounding Land Use and Zoning: <br /> North: North Relief Canal, Grove/Residential PD being rezoned to RS-3) <br /> South: 53rd Street, Vacant/RM-6 <br /> East: River Club Golf Course, Residential, Commercial Marina/RM-6, CG <br /> West: Vacant, Retail / CG <br /> ,'"Now <br /> 9. Traffic Circulation: The site will be accessed from 53rd Street through a private, <br /> north/south roadway that generally aligns with Indian River Boulevard. That north/south <br /> road will extend to the north property line of The Reserve and is designed to accommodate a <br /> future bridge connection over the North Relief Canal and provide access to residentially <br /> zoned property to the north that is presently owned by the applicant. Thus, the plan <br /> accommodates a future, private north/south road that could run from Indian River Blvd to <br /> 63rd Street. In addition,the applicant has agreed to grant access rights via The Reserve final <br /> plat to residentially zoned properties to the north,thereby allowing future traffic from those <br /> properties to travel on The Reserve's north/south road if and when a bridge over the North <br /> Relief Canal is constructed. As proposed,two internal roads will loop to the east and west of <br /> The Reserve's north/south road and provide access to the individual lots. Traffic <br /> Engineering has reviewed and approved the internal circulation plan. <br /> Recently, the applicant submitted a traffic study for the proposed development and <br /> remaining development within the Grand Harbor DRI. Based on the results of that study, <br /> Traffic Engineering and the applicant agreed that a traffic signal is needed at the intersection <br /> of Indian River Boulevard and 53rd Street, at the project entrance. Currently, Traffic <br /> Engineering and the applicant are negotiating a developer's agreement that will establish the <br /> parameters of providing the referenced signal improvements. Prior to issuance of a land <br /> development permit(LDP),the applicant must enter into a developer's agreement to provide <br /> for the traffic signal and maintenance. <br /> F:Tommunity Deve1opment\CurDevABCC\2013 BCC\TheReserveCa)G11.doc 3 <br /> 194 <br />