My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. Plywood Product Standards: Comply with PS 1 (ANSI A 199.1) or, for products not <br /> manufactured under PS 1 provisions,with applicable APA Performance Standard for type <br /> of panel indicated. <br /> H. Installation of all required new rough carpentry for roofing and flashing terminations to <br /> ensure plumb,uniform and level metal flashings. <br /> I. Rough carpentry installation shall ensure roof membrane flashing transitions are smooth <br /> for complete roof drainage and appearance. <br /> J. Installation of all fasteners and associated materials to secure rough carpentry as detailed <br /> and specified. <br /> 1.07 DELIVERY,STORAGE,AND HANDLING <br /> A. Keep materials under cover and dry. Protect against exposure to weather and contact <br /> with damp or wet surfaces. Store a minimum of four inches above ground on framework <br /> or blocking. Stack lumber as well as plywood and other panels; provide for air <br /> circulation within and around stacks. Cover with protective waterproof covering <br /> providing for adequate air circulation and ventilation <br /> B. Exposure to precipitation during shipping, storage or installation shall be avoided. If <br /> material does become wet, it shall be replaced or permitted to dry prior to covering or <br /> enclosure by other roofing, sheet metal or other construction materials (except for <br /> protection during construction). <br /> C. Immediately upon delivery to job site,place materials in area protected from weather. <br /> D. Do not store seasoned materials in wet or damp portions of building. <br /> E. Protect sheet materials from corners breaking and damaging surfaces,while unloading. <br /> PART 2 PRODUCTS <br /> 2.01 MATERIALS <br /> A. Lumber: Shall Be No. 2 or better spruce or southern yellow pine. Shall be sound, <br /> thoroughly seasoned, dressed to nominal finish dimension,and free of warpage,cupping, <br /> and bowing. Dimensions shall be determined by job conditions or as indicated in detail <br /> drawings. <br /> B. Plywood Sheathing: Shall be structural 1 rated. Plywood shall be stamped APA RATED <br /> SHEATHING grade-C or better, and shall be manufactured with exterior glue (exposure <br /> 1). Plywood shall have a minimum thickness of 3/4 inch or as required to match existing. <br /> C. Preservative Treatment for Above Ground Use: <br /> 1. Treatment: ACQ as manufactured for Viance in accordance with AWPA U1 and <br /> P5,P26,P27,P28,P29 as appropriate. <br /> a. Use 0.15 lb/cu ft (2.4 kg/m3) of ACQ in accordance with AWPA UI: <br /> (UC3B)as appropriate. <br /> 2. Treatment: Ecolife or EL2 as manufactured by Viance. <br /> Sebastian Corners Roof Replacement 06 10 00-3 Rough Carpentry <br />
The URL can be used to link to this page
Your browser does not support the video tag.