Laserfiche WebLink
transition at butted joints,and to prevent warping and/or twisting. <br /> N. Shims: <br /> 1. The Contractor shall add plywood and lumber shims as required for the specified <br /> height and thickness. <br /> 2. Shims shall make full contact with stacked rough carpentry. Partial shim contact, <br /> and small shim pieces spaced apart are not acceptable. <br /> 3. Plywood used as blocking or shim shall be installed below dimensional lumber <br /> such that the fastener head terminates at the dimensional lumber surface. <br /> O. Curbs: <br /> 1. Adjust wood curbs to support rooftop piping,ducts,equipment,etc. <br /> 2. Raise equipment to provide required flashing height for roofing. <br /> 3.04 CLEAN-UP <br /> A. The Contractor shall ensure the site and building are cleaned to meet pre-construction <br /> conditions,as accepted by the Owner. <br /> B. The site and building shall be free of saw dust from pressure treated lumber,fasteners and <br /> other debris. <br /> C. Damages to the building,grounds,equipment and site shall be repaired or replaced by the <br /> Contractor to meet pre-construction conditions,as accepted by the Owner. <br /> END OF SECTION 0610 00 <br /> Sebastian Corners Roof Replacement 06 10 00-9 Rough Carpentry <br />