Laserfiche WebLink
C. Tapered insulation plan from material supplier with minimum R-value for each roof area. <br /> D. Latest edition of the Manufacturer's current material specifications and installation <br /> instructions. <br /> 1.06 QUALITY ASSURANCE <br /> A. Insulation to be installed in accordance with their respective manufacturer's requirements. <br /> B. Insulation(s)not bearing UL label at point of delivery shall be rejected. <br /> C. Insulation damaged or wetted before, during, or after installation shall be removed from <br /> the job site no later than the next working day from the day such damage or moisture <br /> contamination is noted. <br /> D. Wind Design: Install insulation system to meet the required wind uplift pressures as <br /> specified on construction drawings. <br /> 1.07 DELIVERY,STORAGE,AND HANDLING <br /> A. Delivery: Material shall be delivered in the manufacturer's original sealed and labeled <br /> shrouds and in quantities to allow continuity application. <br /> B. Storage: Materials shall be stored out of direct exposure to the elements on pallets or <br /> dunnage at least 4 inches above ground level at site location acceptable to Owner. <br /> 1. Utilize tarps that will completely cover materials to prevent moisture <br /> contamination. Remove or slit factory shrouds and/or visqueen; do not use these <br /> materials as tarps. <br /> 2. Install vapor retarders under material storage areas located on the ground. <br /> 3. Remove damaged or deteriorated materials from the job site. <br /> C. Handling: Material shall be handled in such a manner to preclude damage and <br /> contamination with moisture or foreign matter. <br /> 1.08 PROJECT CONDITIONS <br /> A. Insulation shall not be applied during precipitation. Contractor assumes all responsibility <br /> for starting installation in the event there is a probability of precipitation occurring during <br /> application. <br /> B. Contractor will take necessary action to restrict dust,asphalt,and debris from entering the <br /> structure. <br /> C. No more roofing will be removed than can be replaced with insulation, membrane and <br /> base flashings in the same day to create a watertight installation. <br /> PART 2 PRODUCTS <br /> 2.01 MATERIALS <br /> A. Insulation Boards: <br /> 1. Roof Insulation: <br /> Sebastian Corners Roof Replacement 07 22 16-2 Roof Insulation <br />