My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Tapered insulation plan from material supplier with minimum R-value for each roof area. <br /> D. Latest edition of the Manufacturer's current material specifications and installation <br /> instructions. <br /> 1.06 QUALITY ASSURANCE <br /> A. Insulation to be installed in accordance with their respective manufacturer's requirements. <br /> B. Insulation(s)not bearing UL label at point of delivery shall be rejected. <br /> C. Insulation damaged or wetted before, during, or after installation shall be removed from <br /> the job site no later than the next working day from the day such damage or moisture <br /> contamination is noted. <br /> D. Wind Design: Install insulation system to meet the required wind uplift pressures as <br /> specified on construction drawings. <br /> 1.07 DELIVERY,STORAGE,AND HANDLING <br /> A. Delivery: Material shall be delivered in the manufacturer's original sealed and labeled <br /> shrouds and in quantities to allow continuity application. <br /> B. Storage: Materials shall be stored out of direct exposure to the elements on pallets or <br /> dunnage at least 4 inches above ground level at site location acceptable to Owner. <br /> 1. Utilize tarps that will completely cover materials to prevent moisture <br /> contamination. Remove or slit factory shrouds and/or visqueen; do not use these <br /> materials as tarps. <br /> 2. Install vapor retarders under material storage areas located on the ground. <br /> 3. Remove damaged or deteriorated materials from the job site. <br /> C. Handling: Material shall be handled in such a manner to preclude damage and <br /> contamination with moisture or foreign matter. <br /> 1.08 PROJECT CONDITIONS <br /> A. Insulation shall not be applied during precipitation. Contractor assumes all responsibility <br /> for starting installation in the event there is a probability of precipitation occurring during <br /> application. <br /> B. Contractor will take necessary action to restrict dust,asphalt,and debris from entering the <br /> structure. <br /> C. No more roofing will be removed than can be replaced with insulation, membrane and <br /> base flashings in the same day to create a watertight installation. <br /> PART 2 PRODUCTS <br /> 2.01 MATERIALS <br /> A. Insulation Boards: <br /> 1. Roof Insulation: <br /> Sebastian Corners Roof Replacement 07 22 16-2 Roof Insulation <br />
The URL can be used to link to this page
Your browser does not support the video tag.