My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.01 SUBSTITUTIONS—PRIOR TO BID <br /> A. Conditions: The Contractor's substitution request will be received and considered by the <br /> Engineer when all of the following conditions are satisfied, as determined by the <br /> Engineer; otherwise requests will be returned without action except to record <br /> noncompliance with these requirements. <br /> 1. Extensive revisions to Contract Documents are not required. <br /> 2. Proposed changes are in keeping with the general intent of Contract Documents. <br /> 3. The request is timely,fully documented and properly submitted. <br /> 4. The request is directly related to an "or equal" clause or similar language in the <br /> Contract Documents. <br /> B. The Contractor's submittal and Engineer's acceptance of Shop Drawings, Product Data <br /> or Samples that relate to construction activities not complying with the Contract <br /> Documents does not constitute an approval or valid request for substitution. <br /> 2.02 SUBSTITUTIONS—AFTER AWARD OF CONTRACT <br /> A. Substitutions after award are solely for the convenience of the Contractor, and Engineer <br /> nor Owner is under any obligation to review or approve proposed substitutions. <br /> Substitutions that are approved by the Engineer, will be done by Change Order which is <br /> accompanied by a credit to the Owner. The Contractor shall be required to bear any <br /> additional costs related to making the substituted material or system work, such as extra <br /> engineering, material or system modifications, or any time considerations relating to <br /> material or system installation requirements. <br /> PART 3 EXECUTION(NOT USED) <br /> END OF SECTION 0125 00 <br /> Sebastian Corners Roof Replacement 01 25 00-3 Product Substitutions <br />
The URL can be used to link to this page
Your browser does not support the video tag.