Laserfiche WebLink
2.01 SUBSTITUTIONS—PRIOR TO BID <br /> A. Conditions: The Contractor's substitution request will be received and considered by the <br /> Engineer when all of the following conditions are satisfied, as determined by the <br /> Engineer; otherwise requests will be returned without action except to record <br /> noncompliance with these requirements. <br /> 1. Extensive revisions to Contract Documents are not required. <br /> 2. Proposed changes are in keeping with the general intent of Contract Documents. <br /> 3. The request is timely,fully documented and properly submitted. <br /> 4. The request is directly related to an "or equal" clause or similar language in the <br /> Contract Documents. <br /> B. The Contractor's submittal and Engineer's acceptance of Shop Drawings, Product Data <br /> or Samples that relate to construction activities not complying with the Contract <br /> Documents does not constitute an approval or valid request for substitution. <br /> 2.02 SUBSTITUTIONS—AFTER AWARD OF CONTRACT <br /> A. Substitutions after award are solely for the convenience of the Contractor, and Engineer <br /> nor Owner is under any obligation to review or approve proposed substitutions. <br /> Substitutions that are approved by the Engineer, will be done by Change Order which is <br /> accompanied by a credit to the Owner. The Contractor shall be required to bear any <br /> additional costs related to making the substituted material or system work, such as extra <br /> engineering, material or system modifications, or any time considerations relating to <br /> material or system installation requirements. <br /> PART 3 EXECUTION(NOT USED) <br /> END OF SECTION 0125 00 <br /> Sebastian Corners Roof Replacement 01 25 00-3 Product Substitutions <br />