My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01 31 00 <br /> PROJECT MANAGEMENT AND COORDINATION <br /> PART 1 GENERAL <br /> 1.01 SECTION INCLUDES <br /> A. This Section includes administrative provisions for coordinating construction operations <br /> on Project including,but not limited to,the following: <br /> 1. General project coordination procedures. <br /> 2. Coordination. <br /> 3. Administrative and supervisory personnel. <br /> 4. Project meetings. <br /> 5. Weekly Reports <br /> 1.02 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and Supplementary <br /> Conditions and Specification Sections,apply to this Section. <br /> 1.03 COORDINATION <br /> A. Coordinate construction operations with those of other contractors and entities to ensure <br /> efficient and orderly installation of each part of the Work. The Contractor shall coordi- <br /> nate its operations with those included in different Sections that depend on each other for <br /> proper installation,connection,and operation. <br /> 1. Schedule construction operations in sequence required to obtain the best results <br /> where installation of one part of the Work depends on installation of other com- <br /> ponents,before or after its own installation. <br /> 2. Coordinate installation of different components with other contractors to ensure <br /> maximum accessibility for required maintenance,service,and repair. <br /> 3. Make adequate provisions to accommodate items scheduled for later installation. <br /> B. Progress Reporting: The scheduling and sequence of all operations shall be carefully co- <br /> ordinated with the Owner and Engineer. <br /> C. If necessary,prepare memoranda for distribution to each party involved,outlining special <br /> procedures required for coordination. Include such items as required notices,reports,and <br /> list of attendees at meetings. <br /> 1. Prepare similar memoranda for Owner and separate contractors if coordination of <br /> their Work is required. <br /> D. Administrative Procedures: Coordinate scheduling and timing of required administrative <br /> procedures with other construction activities and activities of other contractors to avoid <br /> conflicts and to ensure orderly progress of the Work. Such administrative activities in- <br /> clude,but are not limited to,the following: <br /> 1. Preparation of Contractor's Construction Schedule. <br /> 2. Preparation of the Schedule of Values. <br /> 3. Installation and removal of temporary facilities and controls. <br /> Sebastian Corners Roof Replacement 01 31 00-1 Project Management and Coordination <br />
The URL can be used to link to this page
Your browser does not support the video tag.