Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Attendance: Owner,Engineer,Contractor,material manufacturer. <br /> 3. Minimum Agenda: Walkover inspection; verification of substantial completion; <br /> identification of punch list items; identification of problems, which may impede <br /> issuance of warranties. <br /> 4. Refer to Section 01 77 00 for other requirements. <br /> D. Final Inspection Meeting <br /> 1. Scheduled by Owner and Engineer upon written notification of final completion <br /> of work from the Contractor. <br /> 2. Attendance: Owner,Engineer,Contractor. <br /> 3. Minimum Agenda: Verification of final completion including the completion of <br /> the punch list items. <br /> 4. Refer to Section 01 77 00 for other requirements. <br /> 1.05 REPORTS <br /> A. Weekly Construction Reports: Prepare a weekly construction report recording the fol- <br /> lowing information concerning events at Project site and Fax or email a copy to the Engi- <br /> neer by noon on the following Monday: <br /> 1. Approximate daily count of personnel at Project Site. <br /> 2. Daily material deliveries. <br /> 3. Daily High and low temperatures and general weather conditions. <br /> 4. Accidents. <br /> 5. Unusual events. <br /> 6. Stoppages,delays,shortages,and losses. <br /> 7. Orders and requests of authorities having jurisdiction. <br /> 8. Change Orders received and implemented. <br /> 9. Change Directives received and implemented. <br /> 10. Daily Allowance and Unit Cost usage. <br /> PART 2 PRODUCTS(NOT USED) <br /> PART 3 EXECUTION(NOT USED) <br /> END OF SECTION 01 31 00 <br /> Sebastian Corners Roof Replacement 01 31 00-3 Project Management and Coordination <br />