My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 0133 00 <br /> SUBMITTAL PROCEDURES <br /> PART 1 GENERAL <br /> 1.01 SECTION INCLUDES <br /> A. This Section includes administrative and procedural requirements for submitting Shop <br /> Drawings,Product Data, Samples,and other miscellaneous submittals. <br /> 1.02 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and Supplementary <br /> Conditions and Specification Sections,apply to this Section. <br /> 1.03 SUBMITTAL PROCEDURE <br /> A. General: The Contractor is responsible for providing the submittals to the Engineer. Each <br /> submittal must be accepted in writing prior to commencement of work. <br /> B. Submission Requirements: Submit all required submittals electronically in pdf format to <br /> the Engineer for review. The submittals will then be returned electronically to the <br /> Contractor with comments. Final submittals will require written responses to all <br /> Construction Document submittal comments. <br /> C. Processing Time: Allow time for submittal review, including time for resubmittals, as <br /> specified below. Time for review shall commence on Engineer's receipt of submittal. <br /> 1. Initial Review: Allow 7 work days for initial review of submittals. <br /> 2. Allow 7 work days for processing each resubmittal. <br /> 3. No extension of the Contract Time will be authorized because of failure to <br /> transmit submittals enough in advance of the Work to permit processing. <br /> D. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract <br /> Documents on submittals and provide letter describing in detail any proposed changes, <br /> substitutions, or deviations from the project or manufacturer's specifications. A written <br /> explanation of why substitutions should be considered is required and shall be included <br /> under the appropriate tab. <br /> E. Transmittal and Identification: Package submittals appropriately and include a title page <br /> and/or pdf bookmark for each numbered schedule of submittal item identified below. <br /> Engineer will discard submittals received from sources other than Contractor. Include <br /> Contractor's certification stating that information submitted complies with requirements <br /> of the Contract Documents. <br /> F. Use for Construction: Use only final submittals with mark indicating action taken by <br /> Engineer in connection with construction. <br /> 1.04 SCHEDULE OF SUBMITTALS <br /> A. The following submittal items shall be submitted electronically with a title page and/or <br /> pdf bookmark for each submittal item to meet the requirements specified herein: <br /> 1. Emergency contact list including pager, mobile and home numbers of key <br /> Sebastian Corners Roof Replacement 01 33 00-1 Submittal Procedures <br />
The URL can be used to link to this page
Your browser does not support the video tag.