SECTION 0133 00 <br /> SUBMITTAL PROCEDURES <br /> PART 1 GENERAL <br /> 1.01 SECTION INCLUDES <br /> A. This Section includes administrative and procedural requirements for submitting Shop <br /> Drawings,Product Data, Samples,and other miscellaneous submittals. <br /> 1.02 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and Supplementary <br /> Conditions and Specification Sections,apply to this Section. <br /> 1.03 SUBMITTAL PROCEDURE <br /> A. General: The Contractor is responsible for providing the submittals to the Engineer. Each <br /> submittal must be accepted in writing prior to commencement of work. <br /> B. Submission Requirements: Submit all required submittals electronically in pdf format to <br /> the Engineer for review. The submittals will then be returned electronically to the <br /> Contractor with comments. Final submittals will require written responses to all <br /> Construction Document submittal comments. <br /> C. Processing Time: Allow time for submittal review, including time for resubmittals, as <br /> specified below. Time for review shall commence on Engineer's receipt of submittal. <br /> 1. Initial Review: Allow 7 work days for initial review of submittals. <br /> 2. Allow 7 work days for processing each resubmittal. <br /> 3. No extension of the Contract Time will be authorized because of failure to <br /> transmit submittals enough in advance of the Work to permit processing. <br /> D. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract <br /> Documents on submittals and provide letter describing in detail any proposed changes, <br /> substitutions, or deviations from the project or manufacturer's specifications. A written <br /> explanation of why substitutions should be considered is required and shall be included <br /> under the appropriate tab. <br /> E. Transmittal and Identification: Package submittals appropriately and include a title page <br /> and/or pdf bookmark for each numbered schedule of submittal item identified below. <br /> Engineer will discard submittals received from sources other than Contractor. Include <br /> Contractor's certification stating that information submitted complies with requirements <br /> of the Contract Documents. <br /> F. Use for Construction: Use only final submittals with mark indicating action taken by <br /> Engineer in connection with construction. <br /> 1.04 SCHEDULE OF SUBMITTALS <br /> A. The following submittal items shall be submitted electronically with a title page and/or <br /> pdf bookmark for each submittal item to meet the requirements specified herein: <br /> 1. Emergency contact list including pager, mobile and home numbers of key <br /> Sebastian Corners Roof Replacement 01 33 00-1 Submittal Procedures <br />