Laserfiche WebLink
Contractor and Subcontractor personnel, and office and mobile numbers of key <br /> Owner and REI personnel. <br /> 2. Work schedule indicating start date, crew size, production rate, completion date, <br /> etc. <br /> 3. Copy of Contractor's Certificate of Insurance <br /> 4. Copy of Construction Permits <br /> 5. Roof Manufacturer's Acknowledgement Form(Section 00 62 33) <br /> 6. Copy of all warranties indicated in Section 01 77 00 to meet the requirements of <br /> their respective specification section <br /> 7. Letter describing in detail any proposed changes, substitutions, or deviations <br /> from the project or manufacturer's specifications. A written explanation of why <br /> substitutions should be considered is required. <br /> 8. Shop drawings or letter stating that the contractor will install materials as detailed <br /> in the Contract Drawings unless properly authorized by the Engineer. <br /> 9. Steel Deck Repair/Securement(Section 05 31 23) <br /> 10. Rough Carpentry(Section 06 10 00) <br /> 11. Preparation for Reroofing(Section 07 01 50) <br /> 12. Roof Insulation(Section 07 22 16) <br /> 13. Thermoplastic Single Ply Roofing(Section 07 54 00) <br /> 14. Sheet Metal Flashing and Trim(Section 07 62 00) <br /> 15. Roof Accessories(Section 07 72 00) <br /> 16. Existing damaged/dysfunctional components documentation (videotape, photos, <br /> etc.) including but not limited to; asphalt spills, windows, walls, sidewalks, <br /> paving, ceilings, etc. Lack of submission prior to commencement of work <br /> indicates Contractor has discovered no existing damaged components and takes <br /> responsibility for any damages caused by operations. <br /> 17. Complete list of materials with Safety Data Sheets(SDS) <br /> PART 2 PRODUCTS <br /> 2.01 SUBMITTALS <br /> A. General: Prepare and submit Submittals required herein and by individual Specification <br /> Sections. <br /> B. Product Data: Collect information into a single submittal for each element of <br /> construction and type of product or equipment. <br /> 1. If information must be specially prepared for submittal because standard printed <br /> data are not suitable for use,submit as Shop Drawings,not as Product Data. <br /> 2. Mark each copy of each submittal to show which products and options are <br /> applicable. <br /> 3. Include the following information,as applicable: <br /> a. Manufacturer's written recommendations. <br /> b. Manufacturer's product specifications. <br /> c. Manufacturer's installation instructions. <br /> d. Manufacturer's catalog cuts. <br /> e. Printed performance curves. <br /> f. Operational range diagrams. <br /> g. Compliance with recognized trade association standards. <br /> h. Compliance with recognized testing agency standards. <br /> C. Shop Drawings: Prepare Project-specific information,drawn accurately to scale. Do not <br /> Sebastian Corners Roof Replacement 01 33 00-2 Submittal Procedures <br />