My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor and Subcontractor personnel, and office and mobile numbers of key <br /> Owner and REI personnel. <br /> 2. Work schedule indicating start date, crew size, production rate, completion date, <br /> etc. <br /> 3. Copy of Contractor's Certificate of Insurance <br /> 4. Copy of Construction Permits <br /> 5. Roof Manufacturer's Acknowledgement Form(Section 00 62 33) <br /> 6. Copy of all warranties indicated in Section 01 77 00 to meet the requirements of <br /> their respective specification section <br /> 7. Letter describing in detail any proposed changes, substitutions, or deviations <br /> from the project or manufacturer's specifications. A written explanation of why <br /> substitutions should be considered is required. <br /> 8. Shop drawings or letter stating that the contractor will install materials as detailed <br /> in the Contract Drawings unless properly authorized by the Engineer. <br /> 9. Steel Deck Repair/Securement(Section 05 31 23) <br /> 10. Rough Carpentry(Section 06 10 00) <br /> 11. Preparation for Reroofing(Section 07 01 50) <br /> 12. Roof Insulation(Section 07 22 16) <br /> 13. Thermoplastic Single Ply Roofing(Section 07 54 00) <br /> 14. Sheet Metal Flashing and Trim(Section 07 62 00) <br /> 15. Roof Accessories(Section 07 72 00) <br /> 16. Existing damaged/dysfunctional components documentation (videotape, photos, <br /> etc.) including but not limited to; asphalt spills, windows, walls, sidewalks, <br /> paving, ceilings, etc. Lack of submission prior to commencement of work <br /> indicates Contractor has discovered no existing damaged components and takes <br /> responsibility for any damages caused by operations. <br /> 17. Complete list of materials with Safety Data Sheets(SDS) <br /> PART 2 PRODUCTS <br /> 2.01 SUBMITTALS <br /> A. General: Prepare and submit Submittals required herein and by individual Specification <br /> Sections. <br /> B. Product Data: Collect information into a single submittal for each element of <br /> construction and type of product or equipment. <br /> 1. If information must be specially prepared for submittal because standard printed <br /> data are not suitable for use,submit as Shop Drawings,not as Product Data. <br /> 2. Mark each copy of each submittal to show which products and options are <br /> applicable. <br /> 3. Include the following information,as applicable: <br /> a. Manufacturer's written recommendations. <br /> b. Manufacturer's product specifications. <br /> c. Manufacturer's installation instructions. <br /> d. Manufacturer's catalog cuts. <br /> e. Printed performance curves. <br /> f. Operational range diagrams. <br /> g. Compliance with recognized trade association standards. <br /> h. Compliance with recognized testing agency standards. <br /> C. Shop Drawings: Prepare Project-specific information,drawn accurately to scale. Do not <br /> Sebastian Corners Roof Replacement 01 33 00-2 Submittal Procedures <br />
The URL can be used to link to this page
Your browser does not support the video tag.