My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M. Manufacturer's Instructions: Prepare written or published information that documents <br /> manufacturer's recommendations, guidelines, and procedures for installing or operating a <br /> product or equipment. Include name of product and name, address, and telephone <br /> number of manufacturer. <br /> PART 3 EXECUTION <br /> 3.01 CONTRACTOR'S REVIEW <br /> A. Review each submittal, check for compliance with the Contract Documents and note <br /> corrections and field dimensions prior to submitting to Engineer. <br /> 3.02 ENGINEER'S ACTION <br /> A. Submittals: Engineer will review each submittal, make marks to indicate corrections or <br /> modifications required, and return it. Engineer will stamp each submittal item with an <br /> action stamp and will mark stamp appropriately to indicate action taken. <br /> B. Submittals not required by the Contract Documents will not be reviewed and may be <br /> discarded. <br /> END OF SECTION 0133 00 <br /> Sebastian Corners Roof Replacement 01 33 00-4 Submittal Procedures <br />
The URL can be used to link to this page
Your browser does not support the video tag.