Laserfiche WebLink
M. Manufacturer's Instructions: Prepare written or published information that documents <br /> manufacturer's recommendations, guidelines, and procedures for installing or operating a <br /> product or equipment. Include name of product and name, address, and telephone <br /> number of manufacturer. <br /> PART 3 EXECUTION <br /> 3.01 CONTRACTOR'S REVIEW <br /> A. Review each submittal, check for compliance with the Contract Documents and note <br /> corrections and field dimensions prior to submitting to Engineer. <br /> 3.02 ENGINEER'S ACTION <br /> A. Submittals: Engineer will review each submittal, make marks to indicate corrections or <br /> modifications required, and return it. Engineer will stamp each submittal item with an <br /> action stamp and will mark stamp appropriately to indicate action taken. <br /> B. Submittals not required by the Contract Documents will not be reviewed and may be <br /> discarded. <br /> END OF SECTION 0133 00 <br /> Sebastian Corners Roof Replacement 01 33 00-4 Submittal Procedures <br />