Laserfiche WebLink
PART 3 EXECUTION <br /> 3.01 TEMPORARY UTILITIES <br /> A. Water Service: Water for construction purposes will be available from the Owner at no <br /> charge. Contractor shall operate exterior hose bids only with properly fitted handles which <br /> shall be removed at the end of each work day. Any damage to hose bids or hose bib stems <br /> shall be repaired by Contractor. Hose bibs shall not be operated with pliers. <br /> B. Electrical Power Service: Contractor shall provide portable generators for all electrical <br /> power requirements. <br /> C. Electric Distribution: Provide receptacle outlets adequate for connection of power tools <br /> and equipment. <br /> 1. Provide waterproof connectors to connect separate lengths of electrical power <br /> cords if single lengths will not reach areas where construction activities are in <br /> progress. Do not exceed safe length-voltage ratio. <br /> 3.02 CONSTRUCTION FACILITIES <br /> A. Temporary construction facilities shall include the following: <br /> 1. Field Office(if appropriate): prefabricated,mobile units or job-built construction <br /> with lockable entrances and serviceable finishes including lights and utilities. <br /> 2. Sanitary Facilities: Provide temporary toilets,wash facilities,and drinking-water <br /> fixtures. Comply with regulations and health codes for type, number, location, <br /> operation, and maintenance of fixtures and facilities. Facilities will be located at <br /> sites approved by Owner. <br /> a. Disposable Supplies: Provide toilet tissue,paper towels,paper cups,and <br /> similar disposable materials for each facility. Maintain adequate supply. <br /> Provide covered waste containers for disposal of used material. <br /> b. Toilets: Install self-contained toilet units. Shield toilets to ensure privacy. <br /> c. Drinking-Water Facilities: Provide bottled-water,drinking-water units. <br /> 3. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate <br /> to handle waste from construction operations at a location approved by the Owner. <br /> Containerize and clearly label hazardous,dangerous,or unsanitary waste materials <br /> separately from other waste. Comply with Division 1 Section "Execution <br /> Requirements"for progress cleaning requirements. Use of Owner's waste disposal <br /> facilities is not acceptable. <br /> a. If required by authorities having jurisdiction,provide separate containers, <br /> clearly labeled,for each type of waste material to be deposited. <br /> 3.03 VEHICULAR ACCESS AND PARKING <br /> A. Parking for Contractor vehicles may be available only in the approved Set-up and Staging <br /> area. No other vehicle parking on site will be allowed. <br /> 3.04 TEMPORARY BARRIERS AND ENCLOSURES <br /> A. Contractor shall provide temporary barriers and enclosures for protection from exposure, <br /> foul weather, construction operations and other activities. Contractor is responsible for <br /> protecting buildings and grounds from damages during construction. <br /> Sebastian Corners Roof Replacement 01 50 00-2 Temporary Facilities and Controls <br />