My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 3 EXECUTION <br /> 3.01 TEMPORARY UTILITIES <br /> A. Water Service: Water for construction purposes will be available from the Owner at no <br /> charge. Contractor shall operate exterior hose bids only with properly fitted handles which <br /> shall be removed at the end of each work day. Any damage to hose bids or hose bib stems <br /> shall be repaired by Contractor. Hose bibs shall not be operated with pliers. <br /> B. Electrical Power Service: Contractor shall provide portable generators for all electrical <br /> power requirements. <br /> C. Electric Distribution: Provide receptacle outlets adequate for connection of power tools <br /> and equipment. <br /> 1. Provide waterproof connectors to connect separate lengths of electrical power <br /> cords if single lengths will not reach areas where construction activities are in <br /> progress. Do not exceed safe length-voltage ratio. <br /> 3.02 CONSTRUCTION FACILITIES <br /> A. Temporary construction facilities shall include the following: <br /> 1. Field Office(if appropriate): prefabricated,mobile units or job-built construction <br /> with lockable entrances and serviceable finishes including lights and utilities. <br /> 2. Sanitary Facilities: Provide temporary toilets,wash facilities,and drinking-water <br /> fixtures. Comply with regulations and health codes for type, number, location, <br /> operation, and maintenance of fixtures and facilities. Facilities will be located at <br /> sites approved by Owner. <br /> a. Disposable Supplies: Provide toilet tissue,paper towels,paper cups,and <br /> similar disposable materials for each facility. Maintain adequate supply. <br /> Provide covered waste containers for disposal of used material. <br /> b. Toilets: Install self-contained toilet units. Shield toilets to ensure privacy. <br /> c. Drinking-Water Facilities: Provide bottled-water,drinking-water units. <br /> 3. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate <br /> to handle waste from construction operations at a location approved by the Owner. <br /> Containerize and clearly label hazardous,dangerous,or unsanitary waste materials <br /> separately from other waste. Comply with Division 1 Section "Execution <br /> Requirements"for progress cleaning requirements. Use of Owner's waste disposal <br /> facilities is not acceptable. <br /> a. If required by authorities having jurisdiction,provide separate containers, <br /> clearly labeled,for each type of waste material to be deposited. <br /> 3.03 VEHICULAR ACCESS AND PARKING <br /> A. Parking for Contractor vehicles may be available only in the approved Set-up and Staging <br /> area. No other vehicle parking on site will be allowed. <br /> 3.04 TEMPORARY BARRIERS AND ENCLOSURES <br /> A. Contractor shall provide temporary barriers and enclosures for protection from exposure, <br /> foul weather, construction operations and other activities. Contractor is responsible for <br /> protecting buildings and grounds from damages during construction. <br /> Sebastian Corners Roof Replacement 01 50 00-2 Temporary Facilities and Controls <br />
The URL can be used to link to this page
Your browser does not support the video tag.