Laserfiche WebLink
B. Contractor shall provide environmental protection by methods that comply with <br /> environmental regulations and that minimize possible air, waterway, and subsoil <br /> contamination or pollution or other undesirable effects. <br /> C. Contractor shall provide storm water controls sufficient to prevent flooding from heavy <br /> rain. <br /> D. Contractor shall provide 6' chain link fencing with lockable gates and green mesh to <br /> completely enclose the materials storage and staging area. <br /> 3.05 TEMPORARY CONTROLS <br /> A. Contractor shall provide security controls to protect work and materials at the project site. <br /> 3.06 PROJECT SIGNS <br /> A. Contractor shall provide temporary signs to provide information to building occupants <br /> directing them away for construction operations. <br /> END OF SECTION 0150 00 <br /> Sebastian Corners Roof Replacement 01 50 00-3 Temporary Facilities and Controls <br />