My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Contractor shall provide environmental protection by methods that comply with <br /> environmental regulations and that minimize possible air, waterway, and subsoil <br /> contamination or pollution or other undesirable effects. <br /> C. Contractor shall provide storm water controls sufficient to prevent flooding from heavy <br /> rain. <br /> D. Contractor shall provide 6' chain link fencing with lockable gates and green mesh to <br /> completely enclose the materials storage and staging area. <br /> 3.05 TEMPORARY CONTROLS <br /> A. Contractor shall provide security controls to protect work and materials at the project site. <br /> 3.06 PROJECT SIGNS <br /> A. Contractor shall provide temporary signs to provide information to building occupants <br /> directing them away for construction operations. <br /> END OF SECTION 0150 00 <br /> Sebastian Corners Roof Replacement 01 50 00-3 Temporary Facilities and Controls <br />
The URL can be used to link to this page
Your browser does not support the video tag.