My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 0173 29 <br /> CUTTING AND PATCHING <br /> PART 1 GENERAL <br /> 1.01 SECTION INCLUDES <br /> A. This Section includes procedural requirements for cutting and patching. <br /> 1.02 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and Supplementary <br /> Conditions and Specification Sections,apply to this Section. <br /> 1.03 DEFINITIONS <br /> A. Cutting: Removal of existing construction necessary to permit installation or perfor- <br /> mance of other Work. <br /> B. Patching: Fitting and repair work required to restore surfaces to original conditions after <br /> installation of other Work. <br /> 1.04 QUALITY ASSURANCE <br /> A. Engineer's Approval: Obtain approval of cutting and patching before cutting and patch- <br /> ing. Approval does not waive right to later require removal and replacement of unsatis- <br /> factory work. <br /> B. Structural Elements: Do not cut and patch structural elements in a manner that could <br /> change their load-carrying capacity or load-deflection ratio. Where cutting and patching <br /> involve adding reinforcement to structural elements, submit details and engineering cal- <br /> culations sealed by a licensed Engineer in the state of the project showing integration of <br /> reinforcement with original structure. <br /> C. Operational Elements: Do not cut and patch operating elements and related components <br /> in a manner that results in reducing their capacity to perform as intended or that result in <br /> increased maintenance or decreased operational life or safety. <br /> D. Miscellaneous Elements: Do not cut and patch the following elements or related compo- <br /> nents in a manner that could change their load-carrying capacity that results in reducing <br /> their capacity to perform as intended,or that result in increased maintenance or decreased <br /> operational life or safety. <br /> E. Visual Requirements: Do not cut and patch construction in a manner that results in visual <br /> evidence of cutting and patching. Do not cut and patch construction exposed on the exte- <br /> rior or in occupied spaces in a manner that would, in the Engineer's opinion, reduce the <br /> building's aesthetic qualities. Remove and replace construction that has been cut and <br /> patched in a visually unsatisfactory manner. <br /> F. Cutting and Patching Conference: If extensive cutting and patching is required, before <br /> proceeding, meet at Project site with parties involved in cutting and patching, including <br /> mechanical and electrical trades. Review areas of potential interference and conflict. <br /> Coordinate procedures and resolve potential conflicts before proceeding. <br /> Sebastian Corners Roof Replacement 01 73 29-1 Cutting and Patching <br />
The URL can be used to link to this page
Your browser does not support the video tag.