My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.05 WARRANTY <br /> A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or <br /> damaged during cutting and patching operations, by methods and with materials so as not <br /> to void existing warranties. <br /> PART 2 PRODUCTS <br /> 2.01 MATERIALS <br /> A. General: Comply with requirements specified in other Sections of these Specifications. <br /> B. Existing Materials: Use materials identical to existing materials. For exposed surfaces, <br /> use materials that visually match existing adjacent surfaces to the fullest extent possible. <br /> 1. If identical materials are unavailable or cannot be used, use materials that, when <br /> installed,will match the visual and functional performance of existing materials. <br /> PART 3 EXECUTION <br /> 3.01 EXAMINATION <br /> A. Examine surfaces to be cut and patched and conditions under which cutting and patching <br /> are to be performed. <br /> 1. Compatibility: Before patching,verify compatibility with and suitability of sub- <br /> strates, including compatibility with existing finishes or primers. <br /> 2. Proceed with installation only after unsafe or unsatisfactory conditions have been <br /> corrected. <br /> 3.02 PREPARATION <br /> A. Temporary Support: Provide temporary support of Work to be cut. <br /> B. Protection: Protect existing construction during cutting and patching to prevent damage. <br /> Provide protection from adverse weather conditions for portions of Project that might be <br /> exposed during cutting and patching operations. <br /> C. Adjoining Areas: Avoid interference with use of adjoining areas or interruption of free <br /> passage to adjoining areas. <br /> D. Existing Services: Where existing services are required to be removed, relocated, or <br /> abandoned, bypass such services before cutting to minimize interruption of services to <br /> occupied areas. <br /> 3.03 PERFORMANCE <br /> A. General: Employ skilled workers to perform cutting and patching. Proceed with cutting <br /> and patching at the earliest feasible time, and complete without delay. <br /> 1. Cut existing construction to provide for installation of other components or per- <br /> formance of other construction,and subsequently patch as required to restore sur- <br /> faces to their original condition. <br /> B. Cutting: Cut existing construction by sawing, drilling, breaking, chipping, grinding, and <br /> Sebastian Corners Roof Replacement 01 73 29-2 Cutting and Patching <br />
The URL can be used to link to this page
Your browser does not support the video tag.