My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
similar operations, including excavation, using methods least likely to damage elements <br /> retained or adjoining construction. <br /> 1. In general, use hand or small power tools designed for sawing and grinding, not <br /> hammering and chopping. Cut holes and slots as small as possible, neatly to size <br /> required,and with minimum disturbance of adjacent surfaces. Temporarily cover <br /> openings when not in use. <br /> 2. Existing Finished Surfaces: Cut or drill from the exposed or finished side into <br /> concealed surfaces. <br /> 3. Concrete or Masonry: Cut using a cutting machine, such as an abrasive saw or a <br /> diamond-core drill. <br /> 4. Mechanical and Electrical Services: Cut off pipe or conduit in walls or partitions <br /> to be removed. Cap,valve, or plug and seal remaining portion of pipe or conduit <br /> to prevent entrance of moisture or other foreign matter after cutting. <br /> 5. Proceed with patching after construction operations requiring cutting are com- <br /> plete. <br /> C. Patching: Patch construction by filling,repairing,refinishing, closing up, and similar op- <br /> erations following performance of other Work. Patch with durable seams that are as in- <br /> visible as possible. Provide materials and comply with installation requirements speci- <br /> fied in other Sections of these Specifications. <br /> 1. Inspection: Where feasible, test and inspect patched areas after completion to <br /> demonstrate integrity of installation. <br /> 2. Exposed Finishes: Restore exposed finishes of patched areas and extend finish <br /> restoration into retained adjoining construction in a manner that will eliminate <br /> evidence of patching and refinishing. <br /> 3. Floors and Walls: Where walls or partitions that are removed extend from one <br /> finished area into another, patch and repair floor and wall surfaces in the new <br /> space. Provide an even surface of uniform finish, color, texture, and appearance. <br /> Remove existing floor and wall coverings and replace with new materials, if nec- <br /> essary,to achieve uniform color and appearance. <br /> a. Where patching occurs in a painted surface, apply primer and intermedi- <br /> ate paint coats over the patch and apply final paint coat over entire un- <br /> broken surface containing the patch. Provide additional coats until patch <br /> blends with adjacent surfaces. <br /> 4. Exterior Building Enclosure: Patch components in a manner that restores enclo- <br /> sure to a weather tight condition. <br /> 5. Ceilings: Patch, repair, or re-hang existing ceilings as necessary to provide an <br /> even-plane surface of uniform appearance. <br /> D. Cleaning: Clean areas and spaces where cutting and patching are performed. Completely <br /> remove paint,mortar,oils,putty and similar materials. <br /> END OF SECTION 0173 29 <br /> Sebastian Corners Roof Replacement 01 73 29-3 Cutting and Patching <br />
The URL can be used to link to this page
Your browser does not support the video tag.