My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 0174 00 <br /> CLEANING AND WASTE MANAGEMENT <br /> PART 1 GENERAL <br /> 1.01 SECTION INCLUDES <br /> A. The Owner has established that this Project shall include proactive measures for waste <br /> management participation by all parties to the contract. <br /> 1. The purpose of this program is to ensure that during the course of the Project all <br /> diligent means are employed to pursue practical and economically feasible waste <br /> management and recycling options. <br /> 2. Upon award, each subcontractor shall be required to furnish documentation from <br /> suppliers or manufacturers regarding waste management and recycling options <br /> for those products and procedures furnished. <br /> 3. Waste disposal to landfills shall be minimized. <br /> 1.02 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and Supplementary <br /> Conditions and Specification Sections,apply to this Section. <br /> 1.03 DEFINITIONS <br /> A. Waste: Any material that has reached the end of its intended use. Waste includes <br /> salvageable,returnable,recyclable and reusable material. <br /> B. Construction waste: Solid wastes including, but not limited to, building materials, <br /> packaging materials,debris and trash resulting from construction operations. <br /> C. Salvage: To remove a waste material from the Project site to another site for resale or <br /> reuse by others. <br /> D. Hazardous waste: Any material or byproduct of construction that is regulated by the <br /> Environmental Protection Agency and that may not be disposed in any landfill or other <br /> waste end-source without adherence to applicable laws. <br /> E. Trash:Any product or material unable to be returned,reused,recycled or salvaged. <br /> F. Landfill:Any public or private business involved in the practice of trash disposal. <br /> G. Waste Management Plan: A Project-related plan for the collection, transportation, and <br /> disposal of the waste generated at the construction site. <br /> PART 2 PRODUCTS <br /> 2.01 MATERIALS <br /> A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or <br /> fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially <br /> hazardous to health or property or that might damage finished surfaces. <br /> PART 3 EXECUTION <br /> Sebastian Corners Roof Replacement 01 74 00-1 Cleaning and Waste Management <br />
The URL can be used to link to this page
Your browser does not support the video tag.