3.01 PROGRESS CLEANING <br /> A. General: Clean Project site and work areas daily, including common areas. Coordinate <br /> progress cleaning for joint-use areas where more than one installer has worked. Enforce <br /> requirements strictly. Dispose of materials in a legal manner. <br /> 1. Comply with requirements in NFPA 241 for removal of combustible waste <br /> materials and debris. <br /> 2. Do not hold materials more than 7 days during normal weather or 3 days if the <br /> temperature is expected to rise above 80 deg F. <br /> 3. Containerize hazardous and unsanitary waste materials separately from other <br /> waste. Mark containers appropriately and dispose of legally, according to <br /> regulations. <br /> B. Site: Maintain Project site free of waste materials and debris. <br /> C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary <br /> for proper execution of the Work. <br /> 1. Remove liquid spills promptly. <br /> 2. Where dust would impair proper execution of the Work,broom-clean or vacuum <br /> the entire work area,as appropriate. <br /> D. Installed Work: Keep installed work clean. Clean installed surfaces according to written <br /> instructions of manufacturer or fabricator of product installed, using only cleaning <br /> materials specifically recommended. If specific cleaning materials are not recommended, <br /> use cleaning materials that are not hazardous to health or property and that will not <br /> damage exposed surfaces. <br /> E. Concealed Spaces: Remove debris from concealed spaces before enclosing the space. <br /> F. Exposed Surfaces: Clean exposed surfaces and protect as necessary to ensure freedom <br /> from damage and deterioration at time of Final Acceptance. <br /> G. Cutting and Patching: Clean areas and spaces where cutting and patching are performed. <br /> Completely remove paint,mortar,oils,putty,and similar materials. <br /> 1. Thoroughly clean piping, conduit, and,similar features before applying paint or <br /> other finishing materials. Restore damaged pipe covering to its original <br /> condition. <br /> H. Waste Disposal: Burying or burning waste materials on-site will not be permitted. <br /> Washing waste materials down sewers or into waterways will not be permitted. <br /> I. During handling and installation, clean and protect construction in progress and adjoining <br /> materials already in place. Apply protective covering where required to ensure protection <br /> from damage or deterioration at Final Acceptance. <br /> J. Clean and provide maintenance on completed construction as frequently as necessary <br /> through the remainder of the construction period. Adjust and lubricate operable <br /> components to ensure operability without damaging effects. <br /> K. Limiting Exposures: Supervise construction operations to assure that no part of the <br /> construction completed or in progress, is subject to harmful, dangerous, damaging, or <br /> Sebastian Corners Roof Replacement 01 74 00-2 Cleaning and Waste Management <br />