Laserfiche WebLink
otherwise deleterious exposure during the construction period. <br /> 3.02 CONSTRUCTION WASTE MANAGEMENT PLAN <br /> A. Waste Management Plan shall include the following: <br /> 1. Solid Waste Disposal and Diversion document. <br /> a. Identification of materials recycled. <br /> b. Identification of materials landfill. <br /> c. Identification of hazardous wastes and disposal. <br /> 2. Locations of sorting and waste storage facilities on Site Plan of project. <br /> 3. Final documentation of subcontractor/supplier waste management/recycling data. <br /> 4. Final documentation of hazardous waste disposal plan. <br /> B. Construction Waste Management Plan Implementation: <br /> 1. The Contractor shall designate an on-site party (or parties) responsible for <br /> instructing workers and overseeing and documenting the Waste Management <br /> Plan. <br /> 2. The"Summary of Construction Waste/Recycling" shall be completed each month <br /> and submitted as part of Application for Payment. <br /> a. All materials identified in the Summary shall be reported by weight. <br /> b. Where weight is not applicable,Contractor shall report materials by units <br /> applicable to material recipient. <br /> c. Contractor shall procure receipts or other validation of waste <br /> management procedures and include them as part of the submittal. <br /> 3. The Contractor shall distribute copies of the "Summary of Construction <br /> Waste/Recycling" to the Consultant, Owner and each subcontractor involved in <br /> the plan. <br /> 4. The Contractor shall provide on-site instruction of appropriate separation, <br /> handling, and recycling, salvage, reuse and return methods to be used by all <br /> parties at appropriate stages of the Work. <br /> 5. Separation facilities: <br /> a. Contractor shall define specific areas to facilitate separation of materials <br /> for recycling,salvage,re-use or return. <br /> b. Recycle and waste bin areas are to be maintained in an orderly manner <br /> and clearly marked to avoid contamination of materials. <br /> c. Do not mix recyclable materials. <br /> d. Store hazardous wastes in secure areas. <br /> 6. Hazardous wastes: <br /> a. Hazardous wastes shall be separated, stored and disposed of in <br /> accordance with local and EPA regulations and additional criteria listed <br /> below: <br /> i. Building products manufactured with PVC or containing <br /> chlorinated compounds shall not be incinerated. <br /> ii. Disposal of fluorescent tubes to open containers is not permitted. <br /> iii. Unused fertilizers shall not be co-mingled with construction <br /> waste. <br /> Sebastian Corners Roof Replacement 01 74 00-3 Cleaning and Waste Management <br />