My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
otherwise deleterious exposure during the construction period. <br /> 3.02 CONSTRUCTION WASTE MANAGEMENT PLAN <br /> A. Waste Management Plan shall include the following: <br /> 1. Solid Waste Disposal and Diversion document. <br /> a. Identification of materials recycled. <br /> b. Identification of materials landfill. <br /> c. Identification of hazardous wastes and disposal. <br /> 2. Locations of sorting and waste storage facilities on Site Plan of project. <br /> 3. Final documentation of subcontractor/supplier waste management/recycling data. <br /> 4. Final documentation of hazardous waste disposal plan. <br /> B. Construction Waste Management Plan Implementation: <br /> 1. The Contractor shall designate an on-site party (or parties) responsible for <br /> instructing workers and overseeing and documenting the Waste Management <br /> Plan. <br /> 2. The"Summary of Construction Waste/Recycling" shall be completed each month <br /> and submitted as part of Application for Payment. <br /> a. All materials identified in the Summary shall be reported by weight. <br /> b. Where weight is not applicable,Contractor shall report materials by units <br /> applicable to material recipient. <br /> c. Contractor shall procure receipts or other validation of waste <br /> management procedures and include them as part of the submittal. <br /> 3. The Contractor shall distribute copies of the "Summary of Construction <br /> Waste/Recycling" to the Consultant, Owner and each subcontractor involved in <br /> the plan. <br /> 4. The Contractor shall provide on-site instruction of appropriate separation, <br /> handling, and recycling, salvage, reuse and return methods to be used by all <br /> parties at appropriate stages of the Work. <br /> 5. Separation facilities: <br /> a. Contractor shall define specific areas to facilitate separation of materials <br /> for recycling,salvage,re-use or return. <br /> b. Recycle and waste bin areas are to be maintained in an orderly manner <br /> and clearly marked to avoid contamination of materials. <br /> c. Do not mix recyclable materials. <br /> d. Store hazardous wastes in secure areas. <br /> 6. Hazardous wastes: <br /> a. Hazardous wastes shall be separated, stored and disposed of in <br /> accordance with local and EPA regulations and additional criteria listed <br /> below: <br /> i. Building products manufactured with PVC or containing <br /> chlorinated compounds shall not be incinerated. <br /> ii. Disposal of fluorescent tubes to open containers is not permitted. <br /> iii. Unused fertilizers shall not be co-mingled with construction <br /> waste. <br /> Sebastian Corners Roof Replacement 01 74 00-3 Cleaning and Waste Management <br />
The URL can be used to link to this page
Your browser does not support the video tag.