Laserfiche WebLink
C. Program profits: <br /> 1. All profits from recycling of construction waste shall be granted to the <br /> Contractor. <br /> 3.03 FINAL CLEANING <br /> A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to <br /> comply with local laws and ordinances and Federal and local environmental and <br /> antipollution regulations. <br /> B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. <br /> Clean each surface or unit to condition expected in an average commercial building <br /> cleaning and maintenance program. Comply with manufacturer's written instructions. <br /> 1. Complete the following cleaning operations before requesting inspection for <br /> certification of Final Acceptance. <br /> a. Clean Project site, yard, and grounds, in areas disturbed by construction <br /> activities, including,waste material, litter,and other foreign substances. <br /> b. Sweep paved areas broom clean. Remove petrochemical spills, stains, <br /> and other foreign deposits. <br /> c. Remove tools, construction equipment, machinery, and surplus material <br /> from Project site. <br /> d. Clean exposed exterior and interior hard-surfaced finishes to a dirt-free <br /> condition, free of stains, films, and similar foreign substances. Avoid <br /> disturbing natural weathering of exterior surfaces. Restore reflective <br /> surfaces to their original condition. <br /> e. Remove debris and surface dust from roofs and walls. <br /> f. Clean transparent materials and glass in windows. Remove glazing <br /> compounds and other noticeable, vision-obscuring materials. Replace <br /> chipped or broken glass and other damaged transparent materials. <br /> g. Remove labels that are not permanent. <br /> h. Touch up and otherwise repair and restore marred, exposed finishes and <br /> surfaces. Replace finishes and surfaces that cannot be satisfactorily <br /> repaired or restored or that already show evidence of repair or <br /> restoration. <br /> i. Wipe surfaces of mechanical and electrical equipment and similar <br /> equipment. Remove excess foreign substances. <br /> j. Replace parts subject to unusual operating conditions. <br /> k. Leave Project clean and ready for occupancy. <br /> C. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury <br /> debris or excess materials on Owner's property. Do not discharge volatile, harmful, or <br /> dangerous materials into drainage systems. Remove waste materials from Project site <br /> and dispose of lawfully. <br /> END OF SECTION 01 74 00 <br /> Sebastian Corners-Roof Replacement 01 74 00-4 Cleaning and Waste Management <br />