My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 0177 00 <br /> CLOSEOUT PROCEDURES <br /> PART 1 GENERAL <br /> 1.01 SECTION INCLUDES <br /> A. This Section includes administrative and procedural requirements for contract closeout, <br /> including,but not limited to,the following: <br /> 1. Inspection Procedures. <br /> 2. Project Record Documents. <br /> 3. Warranties. <br /> 1.02 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and Supplementary <br /> Conditions and Specification Sections,apply to this Section. <br /> P <br /> 1.03 SUBSTANTIAL COMPLETION <br /> A. The Contractor shall submit written certification to the Engineer that the Project is sub- <br /> stantially complete along with the following: <br /> 1. Prepare a list of items to be completed and corrected (Contractor's punch list), <br /> the value of items on the list,and reasons why the Work is not complete. <br /> 2. Advise Owner of pending insurance changeover requirements. <br /> 3. Obtain and submit releases permitting Owner unrestricted use of the Work and <br /> access to services and utilities. Include occupancy permits,operating certificates, <br /> and similar releases. <br /> 4. Terminate and remove temporary facilities from Project site, along with <br /> mockups,construction tools,and similar elements. <br /> 5. Advise Owner of changeover in heat and other utilities. <br /> 6. Submit changeover information related to Owner's occupancy, use, operation, <br /> and maintenance. <br /> 7. Complete final cleaning requirements, including touchup painting. <br /> 8. Touch up and otherwise repair and restore marred exposed finishes to eliminate <br /> visual defects. <br /> B. Substantial Completion Inspection: On receipt of written substantial completion certifi- <br /> cation, the Engineer will make a substantial completion inspection within seven(7) days <br /> after receipt of certification. <br /> 1. Should the Engineer consider the Work not substantially complete, he will im- <br /> mediately notify the Contractor, in writing, stating the reasons. The Contractor <br /> shall complete the Work and send a second written notice to the Engineer, certi- <br /> fying the Project is substantially complete, at which time the Engineer will re- <br /> inspect the work. <br /> 2. Should the Engineer consider the Work substantially complete, Engineer will no- <br /> tify Owner and include a list of items to be completed or corrected(Punch List). <br /> 3. A punch list of items will be prepared for correction and completion before the <br /> Final Inspection. The Contractor shall complete the punch list items within fif- <br /> teen(15)days of the punch list inspection. If the Contractor fails to complete the <br /> Sebastian Corners Roof Replacement 01 77 00-1 Closeout Procedures <br />