My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/1/1994
CBCC
>
Meetings
>
1990's
>
1994
>
11/1/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:04:27 PM
Creation date
6/17/2015 2:48:02 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/01/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEER DESIGN SERVICES, KINGS HIGHWAY IMPROVEMENTS <br />The Board reviewed memo from Capital Projects Manager Terry <br />Thompson dated October 26, 1994: <br />TO: James Chandler <br />County Administrator <br />TERODOE: James W. Davis, P.E. <br />Public Works Director/.- <br />FROM: Terry B. Thompson, Q49 <br />Capital Projects Manager <br />S[7B'ECT: Engineer Design Services <br />Kings Highway Improvements <br />DATE: October 26, 1994 <br />DESCRIPTION AND CONDITIC�ITS <br />The projects listed below have been approved for funding from <br />Traffic Impact Fees, One Cent Local Option Sales Tax and Gas Tax <br />Revenue. The projects have been separated into construction phases <br />based upon anticipated revenue. <br />PHASE I - KINGS HX WAY FROM HTS STRSST TO 26TH STRSST <br />1. SR 60/58th Avenue Intersection Improvements - dual left <br />turn lanes northbound and southbound. <br />2. 58th Avenue Widening north of SR 60 - extend 4 lane <br />divided from 23rd_ to 26th Street transition to existing <br />laneage north of 26th Street. <br />3. <br />58th Avenue <br />Widening south,of SR 60 - 4 lane divided. <br />4. <br />Replacement <br />of 58th Avenue Bridge - 7 lane bridge. <br />5. <br />Paving and Realignment of <br />Atlantic and Lundberg Roads. <br />PMSE II <br />- 8TH, 12TH, <br />AND 16TH STR88TS <br />1. <br />Replace 16th <br />Street Bridge <br />- 3 lane bridge and transition <br />to existing <br />laneage east. <br />2. <br />Replace 12th <br />Street Bridge <br />- 3 lane bridge and transition <br />to existing <br />laneage east. <br />3. <br />Replace 8th Street Bridge <br />- 3 lane bridge and transition <br />to existing <br />laneage east. <br />PSASB III <br />- KINGS BIGE W FROM OSLO <br />ROAD TO STH STREET <br />1. 58th Avenue from Oslo Road to 8th Street - Construct new <br />2 lane section in location of ultimate southbound lanes. <br />Remove existing pavement when new lanes completed. <br />2. Replace Oslo Road Bridge - 5 lane bridge and transition <br />east and west to existing laneage. <br />45 BOOK 3 PACE '�� <br />November 1, 1994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.