My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-168A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-168A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 11:08:59 AM
Creation date
10/15/2018 3:58:30 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/11/2018
Control Number
2018-168A
Agenda Item Number
8.W.
Entity Name
Southern Coatings, Inc.
Subject
West Wastewater Treatment Plant Roof Replacement
Area
8405 8th Street
Project Number
IRC-1803
Bid Number
2018074
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 07 3113 <br />ASPHALT SHINGLE ROOFING <br />PART GENERAL <br />1.01 SECTION INCLUDES <br />A. Installation of a new Underwriters Laboratory 790 Class A, shingle type roof system <br />including flashing and all accessories. <br />1.02 REFERENCES <br />A. Refer to the following references for specification compliance: <br />1. Florida Building Code <br />2. National Roofing Contractors Association - NRCA <br />3. Asphalt Roofing Manufacturers Association - ARMA <br />4. Factory Mutual Research - FM <br />5. Underwriters Laboratories, Inc. - UL <br />1.03 SUBMITTALS <br />A. Refer to Section 013 3 00 -Submittals. <br />B. Selection Samples: Complete set of color cards representing manufacturer's full range of <br />available colors and patterns. <br />C. Submit manufacturer's installation instructions, showing required preparation and <br />installation procedures. <br />D. Manufacturer's Product Data Sheets for all materials specified certifying material complies <br />with all specified requirements. <br />1.04 1 QUALITY ASSURANCE <br />A. Manufacturer Qualifications: Company specializing in manufacturing the roofing system <br />products specified in this section, with minimum 25 years experience. <br />B. Installer Qualifications: Certified or authorized by shingle manufacturer for steep slope <br />installation, certified to install enhanced warranty projects. <br />C. System application to be in accordance with the current Asphalt Roofing Manufacturer's <br />Association's Residential Asphalt Roofing Manual (ARMA) and the proceeding <br />requirements and details. <br />1.05 PRODUCT DELIVERY, STORAGE, AND HANDLING <br />A. Store products in manufacturer's unopened labeled packaging until ready for installation. <br />B. Store products in a covered, ventilated area, at temperature not more than 110 degrees F <br />(43 degrees C); do not store near steam pipes, radiators, etc., or in sunlight. <br />C. Store bundles on flat surface to maximum height recommended by manufacturer. Weight <br />equalization boards must b used if pallets are to be double stacked. <br />Indian River County West WWTP <br />Roof Replacement 0731 13-1 Asphalt Shingle Roofing <br />
The URL can be used to link to this page
Your browser does not support the video tag.