My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-061A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-061A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:38:11 PM
Creation date
4/26/2019 1:10:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-060A
Agenda Item Number
8.D.
Entity Name
Vero Beach Roofing
Subject
Reverse Osmosis Plant Roof Replacement
Area
North Reverse Osmosis Plant
Project Number
IRC-1802
Bid Number
2019031
Alternate Name
RO Plant
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Base Course Mix Design, as applicable, has a minimum Structural Number (SN) of 1.8 for <br />the total thickness of the finished/completed base course. The Contractor shall be <br />responsible for preparing Mix Designs for the Cold Recycled Bituminous Base Course Mix <br />Design or the Reclaimed Asphalt Base Course Mix Design, as applicable, prior to the start <br />of construction. The Contractor will also be required to test the completed base course and <br />provide test results that verify that the completed base course meets the specified <br />Structural Number. In the event that the completed reclaimed asphalt base does not meet <br />the minimum Structural Number specified, the County may require corrective work on the <br />base course or the placement of additional asphalt surface course. All Mix Design <br />testing/preparation and testing for verification of the Structural Number shall be performed <br />by an independent testing laboratory and all costs associated with the Mix Design <br />preparation and SN verification testing shall be the responsibility of the Contractor. <br />The Testing Laboratory performing Cold Recycled Bituminous Base Course Mix Designs or <br />the Reclaimed Asphalt Base Course Mix Designs and SN verification testing shall be an <br />accredited laboratory that is regularly engaged in asphalt testing including the preparation <br />of Mix Designs for Cold Recycled Bituminous Base Course or Reclaimed Asphalt Base <br />Course, and testing to establish and verify Structural Number for asphalt base course <br />layers. The Contractor shall provide information for proposed testing laboratories and mix <br />designs shall be subject to the approval of the County. <br />1. Reclaiming <br />The work item for Reclaimed Asphalt Base Course shall consist of pulverizing an <br />existing bituminous pavement and its base course and mixing them together, adding <br />water and new base material, injecting the specified stabilizing agent directly into <br />the mixing chamber of the reclaiming machine and uniformly mixing it with the <br />pulverized material at the rate and depth specified; and watering, shaping, grading, <br />and compacting the blended material to produce a stabilized base course, true to <br />the established line and grade of the road. The Contractor will be required to <br />perform reclaiming work while traffic is maintained in another lane or lanes of the <br />road. The work item for Reclaimed Asphalt Base Course shall include all necessary <br />traffic control services provided during the reclaiming operation which are not <br />covered under other work items in the Contract. All traffic control and maintenance <br />of traffic is to be performed in conformity with Agency standards with Roadway and <br />Traffic Design Standards, published by the Florida DOT, and with the Manual for <br />Traffic Control Devices, published by the U.S. Department of Transportation. <br />2. Materials <br />a. References: the abbreviated title, "FDOT Specifications," used herein refers to <br />the Standard Specifications for Road and Bridge Construction, of the Florida <br />Department of Transportation. <br />b. Stabilizing Agent: Stabilizing agent shall consist of emulsified asphalt, type CSS - <br />1h, meeting the requirements of ASTM D2397-98 and shall be injected in the base <br />material. <br />c. Asphalt Emulsion Mix Design: Asphalt emulsion is to be used as the stabilizing <br />agent. The Contractor shall obtain a mix design study based on the material in the <br />existing layers. Prior to scheduling the work, the Contractor shall obtain the services <br />of an independent laboratory which shall sample the pavement, base, subgrade and <br />shall perform a modified Marshall Stability Test and a recommendation as the depth <br />01025-17 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1362-OId Dixie Hwy_Highland Dr\1-Admin\Bid Documents\Master Contract <br />Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.