Laserfiche WebLink
Bid Number 2019008 <br />Addendum No. 1 <br />Page 2 of 2 <br />A: Please see the survey attached in this Addendum No. 1. Two areas have been identified for material storage, the <br />area available for staging on the east side of the project is delineated in the plans. An approximate 100' x 40' <br />section, sketch is attached with Addendum No.1, of the parking lot on the west side of the bridge will be <br />provided for the Contractor to use. <br />Attachments: <br />1. Pre -Bid Conference Minutes <br />2. Pre -Bid Conference Sign -In Sheet <br />3. Updated Itemized Bid Schedule, and updated Page 2 of Specifications Division 2 —Technical Provisions <br />4. Wabasso Fishing Pier Demolition and Debris Removal, Bid Plans, March 2019 <br />5. Permit Boundary and Potential Deployment, Artificial Reef Zone 5 <br />6. Bathymetric Survey <br />7. Original Plan "Fishing Walks at Structure B over Indian River", Drawing 1, 1968 <br />8. Wabasso Fishing Piers Rehabilitation, 2006 <br />9. Available staging area on the west side of the bridge <br />*************This Addendum must be acknowledged with submittal package and/or by return of this <br />Acknowledgement with your submittal package ************ <br />Company Name Underwater Engineering Services, Inc. <br />Name: John T. Glanville Title: VP Operations <br />(Type / Printed) <br />Authorized Signature: <br />Date. <br />March 28, 2019 <br />Telephone: (772)337-3116 Email: aconnelly@uesi.com <br />tpeterson@uesi.com <br />