My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-061B
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-061B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:49:18 PM
Creation date
4/26/2019 1:52:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-061B
Agenda Item Number
8.H.
Subject
Wabasso Causeway Fishing Pier Demolition Project
Project Number
IRC-1712
Bid Number
2019035
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 6 <br />Division at purchasing@ircgov.com. <br />PROJECT CONSULTANTS: <br />Atkins, Melbourne, Florida — Kenneth M. Good, PE <br />UTILITIES: <br />FP&L — A known electric cable is running along the waterway bottom to the south of the pier. <br />Other utilities shall be located by the One -Call System. <br />PERMITS: <br />All permitting for the project has been completed. The permits include: <br />Department of the Army Permit - SAJ-2016-02916 (SP -AWP) <br />Department of the Army Permit — SAJ-2017-00473 (NWP-CMM) <br />Department of Environmental Protection — 31 -0354699 -006 -EE <br />OTHER ISSUES <br />• Review and comment with questions and clarifications as soon as possible, no further <br />comments 10 days prior to bid opening (Monday, March 18, 2019). <br />• The Notice to Proceed tentative of Contract Award. <br />• Maintenance of Traffic: <br />- Contractor shall submit a Maintenance of Traffic Plan to the Indian River County, <br />Traffic Division for acceptance. <br />The Maintenance of Traffic Plan shall meet the FDOT Index 600, January 2018 <br />Edition and shall be signed and sealed by a Florida P.E. <br />- Traffic Signs approved by FDOT may be required for Trucks/Equipment <br />entering/leaving the park from the CR -510 Wabasso Bridge Traffic Lanes. <br />- James Ennis (IRC -Assistant Public Works Director) stated that the Wabasso <br />Causeway Bridge falls under FDOT jurisdiction and any operation from the bridge <br />would need approval from FDOT, which would include the Contractor obtaining a <br />permit from FDOT any MOT device or signage to be installed. The County has no <br />ability to grant permission to operate from the structure. <br />Driveway, business and road access shall be maintained at all times <br />• The Contractor will be permitted to restrict the boat ramp usage of the boat ramp for up <br />to 30 min two times a day for loading and unloading. <br />• Staging area is shown on the plan, space is limited for staging and contractor may need to <br />arrange for frequent removal of unsuitable material and construction debris. <br />• The Contractor shall be responsible for removal of all debris generated by the marine & <br />land-based demolition operations, along with restoration of the impacted areas. <br />Excavated material — such as the concrete sidewalk, is to be removed and disposed of by <br />Contractor. <br />• Preparation of Concrete for Reef Deployment — all metal or exposed reinforcement shall <br />be removed as close to the concrete as possible, and extend no more than 6 inches, per <br />the permit requirements. Removed metal material shall be disposed of in an approved <br />manner. <br />• All clean concrete sections over 500 lbs shall be prepared and deployed within the <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \\I712 Wabasso Fishing Pier -Bridge Removal \1 -Admin \Meetings\Pre-Bid <br />Meeting`•:l712 _PreBid_MIN_20190314.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.