My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-057
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 12:51:00 PM
Creation date
4/14/2020 10:51:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/07/2020
Control Number
2020-057
Agenda Item Number
8.G.
Entity Name
MBV Engineering, Inc
Subject
Work Order No. 15, 11th Drive and 37th Street Intersection Improvements (IRC-2001)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M. Test hole data forms will be provided with pertinent information to include <br />size, function, depth, material (of pipes if known) and provide the precise <br />horizontal and vertical position of any discoveries. Offsets will be provided to <br />existing above ground features as well and all discoveries will be painted and <br />flagged with all verification's staked with a semi-permanent marker for <br />surveying purposes. A digital field sketch will be provided along with pictures <br />of the areas in question. <br />n. Customer is advised the vertical portion of the estimate will be based on a per <br />hole fee. Only completed test holes will be invoiced. A mobilization fee is <br />required (if second day of MOB is not required it will not be invoiced). <br />o. Customer understands any fees required for permits and MOT services are not <br />provided and included in this estimate and none are anticipated. <br />P. Cavities will be refilled with dry, native spoils (compacted in 6" lifts). <br />q. Estimate does not include any final restoration such as hot mix asphalt, milling <br />/ resurfacing or special back fill requirements (flowable fill.) If final restoration <br />is required by end client, city, state, or any other entity, that restoration will be <br />the responsibility of the client. Blood Hound does not perform final concrete or <br />asphalt surfacing. BHUG will not perform any excavations thru sidewalk without <br />prior permission. Test holes performed under the roadway will be repaired with <br />an asphalt cold patch and any concrete surfaces will be repaired with a Quikrete <br />type product. <br />r. All Survey work will be completed by IRC. BHUG will coordinate with <br />CONSULTANT on scheduling times for surveying services to avoid delays as much <br />as possible. <br />3. Task 3 —11th Drive Roadway Construction Plans <br />The roadway construction plans shall be developed to provide roadway design from the <br />south property line of the Harbor Bluffs parcel to approximately 150' south of 36th Court. <br />It is anticipated that the Public Road portion to be located on the north side of 37th Street <br />will contain two (2) 12'- wide lanes, a 5'- wide bike lane and a 6' -wide sidewalk. A new <br />driveway connection to the CCIRH Behavioral Health Center to the east, along with a <br />new driveway connection to 12th Court to the west, will also be designed and <br />incorporated into the plans for this section of the road improvement. The roadway plans <br />shall include the design of a southbound left turn / through lane and a dedicated right <br />turn lane at the intersection of 37th Street. <br />It is anticipated the public road portion to be located on the south side of 37' Street will <br />contain (2) 12'- wide lanes and a 6'- wide sidewalk. The Roadway Plans shall include the <br />design of a northbound left turn / through lane and a dedicated right turn lane at the <br />intersection of 37th Street. <br />The CONSULTANT will develop the necessary Demolition plans for those areas north and <br />south of 37th Street as needed to support the 11th Drive Roadway Improvement project <br />and as discussed in preliminary coordination meetings with County staff. CONSULTANT <br />will rely on COUNTY to coordinate with the Cleveland Clinic Indian River Hospital (CCIRH) <br />for all demolition activities that will occur on CCIRH property as associated with this <br />project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.