My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/14/1995
CBCC
>
Meetings
>
1990's
>
1995
>
3/14/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:10 PM
Creation date
6/16/2015 2:19:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/14/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />NORTH U.S. #1 WATER MAIN (CITY OF SEBASTIAN) CHANGE <br />ORDER NO. 4 - SPEEGLE CONSTRUCTION, INC. <br />The Board reviewed a Memorandum of March 2, 1995: <br />DATE: <br />TO: <br />FROM: <br />PREPARED <br />AND STAFFED <br />BY: <br />SUBJECT: <br />MARCH 2, 1995 <br />JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />TERRANCE G. PINTO <br />DIRECTOR OF TIL Y <br />WILLIAM F � CAIN <br />CES <br />MMINEER <br />LITY SERVICES <br />NORTH US 1 WATER MAIN (CITY OF SEBASTIAN) <br />CHANGE ORDER NO. 4 <br />INDIAN RIVER COUNTY PROJECT NO. UW -93 -30 -DS <br />On January 24, 1995, the Indian River County Board of County <br />Commissioners approved a change order to the above contract to run <br />water lines through the riverfront area in Sebastian. (See attached <br />Commission meeting minutes.) The County Utilities Department now <br />would like to oversize the main 12 -inch line on Indian River Drive <br />to its Master -planned line size of 16 inches. This connection will <br />loop our North US 1 water line with the existing Master -planned line <br />at Wal-Mart, north of the Sebastian city limits. This will <br />eliminate the need to run an additional 16 -inch line through the <br />city in the future. <br />ANALYSIS <br />The County Utilities Department has negotiated a cost increase with <br />the contractor, Speegle Construction, Inc., in the amount of <br />$122,537.80. (See attached Change Order No. 4.) We are, therefore, <br />before the Board of County Commissioners requesting approval of the <br />attached change order. Funding for this additional oversizing will <br />be from the impact fee fund. <br />The staff of the Department of Utility Services recommends approval <br />of the attached change order with Speegle Construction, Inc., as <br />presented. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Adams, the Board unanimously <br />approved Change Order No. 4 with Speegle <br />Construction, increasing the amount by <br />$122,537.80, as set out in staff's <br />recommendation. <br />CHANGE ORDER IS ON FILE IN THE OFFICE OF THE CLERK TO THE BOARD <br />77 <br />March 14, 1995 Bou 94 PACE 6-24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.