Laserfiche WebLink
A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />625-010-10 <br />J.R. SMITH, CLERK ROADWAY DESIGN <br />OGC - 08/17 <br />Page 10 of 12 <br />Section No. 88010 CAFA No. 2020 M 490 00001 <br />EXHIBIT "C" <br />TERMS AND CONDITIONS FOR INSTALLATION OF THE PROJECT <br />• All maintenance of traffic (MOT) will be in accordance with the Department's current edition of the Design Standards, <br />(102-600 series). The Operations Engineer or his designee reserves the right to direct the removal/relocation/modification <br />of any traffic device(s) at the Permittee's sole expense. <br />