Laserfiche WebLink
A TRUE COPY <br />CERTIFICATION ON LAST PAGE 825-010-10 <br />J.R. SMITH, CLERK ROADWAY DESIGN <br />oGC -08/17 <br />Page 9 of 12 <br />Section No. 88010 CAFA No. 2020 M 490 00001 <br />EXHIBIT "B" <br />SPECIAL PROVISIONS <br />During construction, highest priority should be given to ensure pedestrian safety. If permission is granted to <br />temporarily close a sidewalk, it should be done with the express condition that an alternate route will be <br />provided, and shall continuously maintain pedestrian features to meet Americans with Disability Act (ADA) <br />standards. <br />• A copy of this permit and plan will be on the job site at all times during the construction of this facility. <br />