Laserfiche WebLink
, A P T I M April 3, 2020 <br />Page 3 of 5 <br />questions will be received. APTIM will attempt to execute each phase of the work in as expeditious a <br />manner as possible. <br />Task 2: Cost <br />The lump sum cost for this task is $12,928.00 <br />Task 3: Pre -Construction Submittals <br />Task 3: Scope of Work and Deliverables <br />APTIM will prepare the request for Notice to Proceed from the FDEP. The request will include the <br />documents listed in the forthcoming permit. Based on previous permits issued to the County, anticipated <br />documents include final construction plans and specifications; turbidity monitoring staff qualifications, <br />turbidity monitoring scope of work and a draft turbidity monitoring map; hardbottom biological monitoring <br />staff qualifications; sea turtle and shorebird monitoring staff qualifications; and the USFWS letter <br />documenting application of the SPBO and PIBO. APTIM will upload the submittal to FDEP's JCP <br />Compliance file transfer site. APTIM will also send the Commencement Notification letters to the FDEP <br />and USACE after corresponding with the Contractor regarding their schedule to begin construction. <br />Correspondence regarding the pre -construction submittals will be via phone and email. The County will <br />be informed and/or copied on correspondence regarding this task. <br />Task 3: Schedule <br />The schedule of task specific deliverables is provided in the Scope of Work for this task. An overall fixed <br />schedule cannot be developed as the Contractor's schedule is unknown. APTIM will attempt to execute <br />each phase of the work in as expeditious a manner as possible. <br />Task 3: Cost <br />The lump sum cost for this task is $4,851.00. <br />Task 4: Pre -Construction Meetings <br />Task 4: Scone of Work and Deliverables <br />APTIM will prepare for, attend, and lead a pre -construction meeting with the permitting agencies and the <br />County's Contractor at the County's offices. Following the meeting with the agencies, the County, APTIM <br />and the Contractor will meet to discuss other aspects of the project. APTIM will take notes from the <br />meetings and distribute draft meeting minutes via email within 10 days of the meeting. If comments are <br />received, the meeting minutes will be revised and redistributed via email within 5 days that the comments <br />are received. <br />Task 4: Schedule <br />The schedule of task specific deliverables is provided in the Scope of Work for this task. An overall fixed <br />schedule cannot be developed as the Contractor's schedule is unknown. APTIM will attempt to execute <br />IRC Sector 3 — 2018006 — WO#7: Pre -Construction Services <br />