My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/02/2020
CBCC
>
Meetings
>
2020's
>
2020
>
06/02/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 1:54:22 PM
Creation date
7/10/2020 12:47:54 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/02/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
following is our rational for why we are respectfully asking you to reconsider the eligibility of these costs <br />as credit to offset our Traffic Impact Fees. <br />INDIAN RIVER TRAFFIC IMPACT FEES <br />Pursuant to IRCCDD.com, "Impact fees are one time charges applied to new development, providing <br />revenue for capacity producing capital improvements to accommodate the demand for those <br />improvements generated by new development in order to maintain adopted levels of service." The <br />reference to "capacity producing capital improvements" is critical to our underlying belief that we qualify <br />for a credit for the costs for traffic and road improvements mandated by the County but paid for by us. <br />Specifically, the improvements we are undertaking were driven by capacity -related issues raised by the <br />County staff. <br />THE "NEW" REQUIRED IMPROVEMENTS VERSUS EXISTING TRAFFIC CONDITIONS: <br />Understanding the additional work that was requisite for securing our site plan approval is important but <br />it's equally important to be aware of the traffic conditions that were pre-existing: (a detailed survey <br />showing the pre-existing conditions is attached as Exhibit 8): <br />1) An existing access road serving the property, <br />2) An existing southbound deceleration lane that was constructed by the County, and <br />3) An existing 133" median allowing two step northbound turns into the access road. <br />The new capital improvements that we are required to construct include the following: (a detailed color - <br />coded survey showing all new work is attached as Exhibit ): <br />1) An extension of the pre-existing southbound deceleration lane that was constructed by the <br />County which we understand was not FDOT compliant. <br />2) The addition of a new north bound 590' acceleration lane and taper on Indian River Boulevard <br />including demolition and removal of the existing median, and <br />3) A new raised median "pork chop" in the existing center median cut including new markings and <br />signage. <br />The existence of the pre-existing traffic conditions provide support to our position. Namely, the existing <br />improvements allowed for all operational function necessary for our Project: ingress/egress, right -in, <br />right -out southbound turns and a two-step northbound turn. None of the newly required modifications <br />provide any new functions. Instead, they only modify and expand the existing conditions to <br />accommodate additional capacity and higher projected trip counts. These types of capital <br />improvements are exactly what traffic impact fees are intended to cover. <br />162 <br />
The URL can be used to link to this page
Your browser does not support the video tag.