My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-116D-2
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-116D-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2020 3:31:29 PM
Creation date
7/28/2020 3:30:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Manual
Approved Date
06/23/2020
Control Number
2020-116D-1
Agenda Item Number
8.N.
Entity Name
Atlantic Roofing
Main Library
Subject
Replacement Roof
Project Number
IRC-1838
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC-1838 Indian River County <br />Main Library <br />Roof Replacement 07 71 19-1 Manufactured Gravel Stops and Fascias <br />SECTION 07 71 19 <br />MANUFACTURED GRAVEL STOPS AND FASCIAS <br /> GENERAL <br />1.1 SECTION INCLUDES <br />A. Provide factory fabricated and finished roof edging. <br />1.2 RELATED SECTIONS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Specification Sections, apply to this Section, including but not limited to: <br />1. Rough Carpentry Section 06 10 00 <br />2. Modified Bitumen Roofing Section 07 52 16 <br />3. Sheet Metal Flashings and Trim Section 07 62 00 <br />1.3 REFERENCES <br />A. 2017 Florida Building Code <br />B. FM Global <br />C. ANSI/SPRI ES-1 <br />1.4 SUBMITTALS <br />A. Refer to Section 01 33 00-Submittal Procedures. <br />B. Manufacturer’s Product Data Sheets for all materials specified certifying material complies <br />with all specified requirements. <br />C. Latest edition of the Manufacturer’s current material specifications and installation <br />instructions. <br />D. Shop drawings: Show profiles, joining method, location of accessory items, anchorage and <br />flashing details, adjacent construction interface, and dimensions. <br />E. Samples: Available on request; sized to adequately represent material. <br />1.5 QUALITY ASSURANCE <br />A. High performance roof edge shall be CERTIFIED by the manufacturer to comply with <br />ANSI/SPRI Standard ES-1. Roof edge/gravelstop shall meet performance design criteria <br />according to the following test standards: [select, if applicable]: <br />1. ANSI/SPRI ES-1 Test Method RE-1 Test for Roof Edge Termination of Single-ply <br />Roofing Membranes: The fascia system shall be tested to secure the membrane <br />to minimum 100 lbs/ft in accord with the ANSI/SPRI ES-1 Test Method RE-1. Use <br />the current edition of ANSI/SPRI ES-1 Wind Design Standard for Edge Systems <br />Used with Low Slope Roofing Systems. <br />2. ANSI/SPRI ES-1 Test Method RE-2 Pull-Off Test for Fascia: The fascia system <br />shall be tested in accord with the ANSI/SPRI ES-1 Test Method RE-2. Use the <br />current edition of ANSI/SPRI ES-1 Wind Design Standard for Edge Systems Used <br />with Low Slope Roofing Systems. <br />3. The roof edge product shall be UL Classified by Underwriters Laboratories, Inc. or
The URL can be used to link to this page
Your browser does not support the video tag.