My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-116D-2
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-116D-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2020 3:31:29 PM
Creation date
7/28/2020 3:30:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Manual
Approved Date
06/23/2020
Control Number
2020-116D-1
Agenda Item Number
8.N.
Entity Name
Atlantic Roofing
Main Library
Subject
Replacement Roof
Project Number
IRC-1838
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC-1838 Indian River County <br />Main Library <br />Roof Replacement 07 71 19-2 Manufactured Gravel Stops and Fascias <br />other 3rd party verification of compliance with the ANSI/SPRI ES-1 Wind Design <br />Standard. <br />1.6 DELIVERY, STORAGE AND HANDLING <br />A. All materials shall be delivered in the manufacturer’s original sealed, labeled containers. <br />B. Store materials in a dry, protected, well-vented area. The contractor shall report damaged <br />material immediately to the delivering carrier and note such damage on the carrier’s freight <br />bill of lading. <br />C. Remove protective plastic surface film after installation. <br />1.7 PROJECT CONDITIONS <br />A. Verify that other trades are complete before installing the roof edging. <br />B. Mounting surfaces shall be straight and secure; substrates shall be of proper width. <br />C. Refer to the construction documents, shop drawings and manufacturer’s installation <br />instructions. <br />D. Coordinate installation with roof membrane manufacturer’s installation instructions. <br />E. Observe all appropriate OSHA safety guidelines for this work. <br />1.8 WARRANTY/GUARANTEE <br />A. Shall be included in Roof System Warranty as specified in Section 07 54 00: <br />1. Manufacturer shall guarantee that a standard size roof edge system, when <br />installed per manufacturer’s instructions, will not blow off, leak, or cause <br />membrane failure, even in wind conditions up to 215 mph (extruded aluminum <br />cleat), or the manufacturer shall replace or repair its materials for a period of twenty <br />years. <br />2. Finish Warranty: Shall be thirty (30) years. <br /> PRODUCTS <br />2.1 MANUFACTURER: <br />A. The following manufacturer's are approved for use: <br />1. W. P. Hickman Company <br />2. Metal Era <br />3. OMG Roofing Products <br />4. Engineer's accepted equivalent <br />2.2 ROOF EDGE: <br />A. Pre-manufactured Edge Metal: Decorative metal fascia with continuous extruded <br />aluminum bar. <br />1. Construction: <br />a. Fascia metal gauge: <br />i. .040 inch (1 mm) thick formed aluminum.
The URL can be used to link to this page
Your browser does not support the video tag.