My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/4/1995
CBCC
>
Meetings
>
1990's
>
1995
>
4/4/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:10 PM
Creation date
6/16/2015 2:21:46 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/04/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Move the Tax Collector's and Property Appraiser's storage into <br />the area presently occupied by Animal Control. Should this not <br />suffice we would need to find some off-site storage. <br />Total estimated cost for Alternative I is $617,000, excluding <br />furnishings, which was budgeted in fiscal year 1994/95 Sales Tax. <br />ALTERNATIVE II <br />This alternative would be to renovate the Courthouse Annex, move <br />Emergency Services into that facility and expand Utilities into <br />their old location. <br />Emergency Services would then have a total or 14,332 square feet of <br />space as compared to VOA's estimated need of 13,760 square feet in <br />1995. Doug Wright has informed this office that he would like to <br />combine the Fire Service administration from Station 1 into the <br />additional space and relocate MED I into Station 1. This would <br />allow the old MED I building to be taken out of service which is in <br />bad need of repairs. <br />Estimated cost to renovate the Courthouse Annex building to meet <br />Emergency Services' needs is approximately $50 per square foot or <br />about $800,000. This would include an emergency generator and <br />elevator. <br />The next step in this alternative is to expand Utility Services <br />into what is now Emergency Services. This would give Utilities an <br />additional 2,380 square feet of space which equates to a total -of - <br />7,367 square feet. Included in this alternative is the moving of <br />SWDD personnel to their new building at the landfill site. This <br />amount of space is taken into consideration and deducted from <br />Utilities' requirement. <br />Cost to renovate the old Emergency Services space to meet the needs <br />of Utilities is estimated to be at $25 per square foot or <br />approximately $60,000. Furnishings for*the space is estimated to <br />be an additional $15,000. <br />Some of the considerations in this alternative would be: <br />1. The structural soundness of the Annex Building may or may not <br />be good as the Administration Building. <br />2. The Annex has roof top air conditioners that could pose a <br />problem in intense hurricane type weather. <br />3. This alternative would not provide Utility Services with a <br />drive -up window or accommodate short time parking for those <br />customers who desire to go in the office and pay their bills. <br />4. Will require additional funding above Alternative I. <br />5. The EOC,would be away from the Administration Buildings and <br />would cause a problem in coordination and communicating during <br />the time of an emergency. <br />6. Does not address our long-term space requirements. <br />7. Will provide Emergency Services with sufficient space. <br />Total estimated cost for this alternative is $936,000. which <br />includes the moving and renovating of other offices as described <br />under Alternative I, excluding furnishings. <br />BOOK 94 PA.U..797 <br />APRIL, 49 1995 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.