Laserfiche WebLink
ORDER NO. PSC -2020 -0212 -PAA -EQ <br />DOCKET NO. 20200114 -EQ <br />PAGE 8 <br />FLORIDA PO FR &;LIGHT: COMPANY <br />Attachment A <br />.. eariec ntltFiftecnth Rcvlsed Sheet NO. 9.032 • <br />(limas T4r4eee14,Fourtcctith Revised Sheet No. 9.032 <br />(Continued from Sheetldo. 9.030 <br />(c) 'If the QS is a REF, the, QS shall, on an annual basis and withinthirty (30) days rifler the anniversary date of this Contract <br />and on an annual basis thereafter for' the terns of this ConiraeL deliVer to FPL a report certified by an officer of the QS: (i) <br />stating the type and amount of each source of fuel or power used by the QS to produce energy riming the twelve month <br />period prior to the anniversary date (the "Contract Yeaf'); and (ii) verifying that one hundred percent (10090) of all energy <br />sold bythe QS to FPL during the Contract Year complies With Sections 1(a) and (b) of this Contract <br />(d) <br />(e) <br />If the QS is a ;RLF, the QS represents and warrants that the Facility tweets the renewable eiteigyieiliur euteuts of Section <br />366.91(2)(a) and (b), Florida Statutes, and FPSC Rules 25-17.210(1) and (2)-, FAC, and that the QS shall continue to <br />meet such requirements throughout the tern of this Contract. FPL shall have the right at all liars to inspect the Facility <br />and to examine any books, records, or other documents of the QS that EPL deems necessary to verify that the Facility meets <br />such requirements. <br />The Facility (i) has been certified or has self -certified as i qualifying facility" pus an the Regulations of the Federal <br />Energy Regulatory Connnission ("FERC ?, or (ii) has been certified by the I PSL as a' qualifying facility" pusanant to Rule <br />2547.080(1). A QS thatis a qualifying facility with a design capacity of leas:than 100 KW shall maintain the "qualifying <br />status" of the Facility throughout the tent of this Contract. FPL shall have the right at all times to inspect the Facility and <br />to examine any books and records or other documents of tlx: Facility Mat FPi. da.ins ncccssary to verify the Facility's <br />qualifying status. On or before 'March 31 of each year during the temi.of this Contract, the QS shall provide to FPL a <br />certificate signed by an officer of the QS certifying that the Facility has continuously maintained qualifying statnq. <br />2. Terni of Contract <br />Except as otherwise provided herein, this Contract shall become effective immediately apron its eXectition by the, Parties (the <br />-Effective Date") and shall have the tenturuatiort date staled inAppeddiX E. -unless terminated earlier in accordance with the provisions hereof. <br />Nnt ithstanding the foregning. if the Civility Delivery Date (as defined in Section :5.S) arise Facility is nnf aecnmplished hy* the in- crevice <br />date of the" avoided fruit, or such later date as may be 'permitted by FPL pursuant to Section 5 of this Contract; FPL will be pemnitted to <br />temtinate this Contract consistent.with the terms herein without further obligations, ditties orliability to'the QS. <br />3. 1litninnrni Specification <br />Following are the minimum specifications pcdaining t0 this Contract <br />1. 'fhc.avoidcd unit ("Avoidedlinit') options on which this Contract is lased are dclailedin Appendix A. <br />2 This offer shall expire on April 1, 2020.2021. <br />.3. The date by which firm capacity and energy deliveries from the QS to FPI, shall commence is the inscivice data of the <br />Avoided Unit (or such later date as may be remitted by FPL pursuant to Section 5 of this contract) unless the QS chooses a capacity payment <br />Option that provides for early capacitypayincnts punnant to the terms of this. Contract. <br />4, The period of time over which firm capacity and energy shall be delivered from the QS to FPL is as specified in Appendix <br />E; provideit, such period shall he no less than a nuniniiun of ten (10) years after the in=se-Mee date of the Avoided Unit. <br />5. The fotlonhng are the mbiinam performance standards, for the delivery of finneapacity end energy by the QS to qualify for <br />'full capacity payments under this Contracr <br />On Peak • All Hours <br />Availability 94.0% 94.0% <br />' QS Performance and On Peak hours shall he as measured and`or etcscrib d in FPL's Rate Sch'edu le QS -2 attached hereto as Appendix A <br />(Continued on Sheet No. 9.032.1) <br />Issued by: 7`itfanyCohen, Director, Kates and Tariffs <br />Effective June -14,281-9 <br />