My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-191A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-191A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 1:05:56 PM
Creation date
1/4/2021 1:03:42 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/16/2018
Control Number
2018-191A
Agenda Item Number
8.I.
Entity Name
IUndian Rivern County
Subject
Victor Hart Sr. Drainage Improvements
Project Number
IRC-1760
Bid Number
20190005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Board of Professional Surveyors and Mappers <br />Record As -Built Survey Checklist <br />Lic. Name Date: <br />Project Name: VICTOR HART SR. COMPLEX DRAINGE IMPROVEMENTS <br />Project No.: IRC -1414 <br />Chapter 61G17-6 Minimum Technical Standards F.A.C. <br />61G17-6.003 General Survey, Map, and Report Content Requirements <br />❑ (1) REGULATORY OBJECTIVE: The public must be able to rely on the <br />accuracy of measurements and maps produced by a surveyor and mapper. In <br />meeting this objective, surveyors and mappers must achieve the following <br />minimum standards of accuracy, completeness, and quality: <br />❑ (a) Accuracy of survey measurements based on the type of survey and <br />expected use. <br />❑ (b) Measurements made in accordance with the United States standard, feet <br />or meters. <br />❑ (c) Records of measurements maintained for each survey (check field notes.) <br />❑ (d) Measurement and computation records dated. <br />❑ (e) Measurement and computation records substantiate the survey map. <br />❑ (f) Measurement and computation records support accuracy statement <br />(closure calculations or redundant measurements, if applicable.) <br />(2) Other More Stringent Requirements: <br />❑ (a) Met more stringent requirements set by federal, state, or local <br />governmental agencies. <br />(3) Other Standards and/or Requirements that Apply to All Surveys, Maps, <br />and/or Survey Products: <br />❑ (a) REGULATORY OBJECTIVE: In order to avoid misuse of a survey and map, <br />the surveyor and mapper must adequately communicate the survey results to <br />the public through a map, report, or report with an attached map. <br />(b) Survey map or report identified the responsible surveyor and mapper and <br />contain standard content. In meeting this objective, surveyors and mappers <br />must meet the following minimum standards of accuracy, completeness, and <br />quality: <br />❑ (c) Type survey stated on map and report: <br />As -Built Survey Mean High Water Line Survey <br />Boundary Survey Quantity Survey <br />Condominium Survey Record Survey <br />Construction Layout Survey Specific or Special Purpose <br />Control Survey Survey <br />Hydrographic Survey Topographic Survey <br />01025-6 Technical Specifications <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1760 Victor Hart Sr. Complex Drainage Improvements\1-Admin\13ids0d <br />Documents\IRC-1760 APPEN A 20180810.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.