Boa 95 mu 265 <br />ORDINANCE 95-10 <br />1. A ' 300' setback from adjacent occupied <br />structures (structures existing as of the date <br />of site plan application for the mining <br />project) to mining pits, on-site haul roads, <br />and -material stockpile areas._ <br />(c) Any mining activity that results in the creation or <br />expansion of a waterbody greater than one-quarter <br />(J) acre in size shall be subject to the provisions <br />of section 934.05, water management standards, of <br />this chapter. Projects creating waterbodies must <br />also provide a safety/security plan for the mining <br />operation phase, including, but not limited to, <br />fences, access, control, and other security <br />methods. <br />(d) If the project site is of a size that falls below <br />St. Johns River Water Management District <br />permitting thresholds and is located (in whole or <br />part) on the Atlantic coastal sand ridge, no <br />excavation governed by a mining permit shall result <br />in an average elevation of less than twenty-five <br />(25) feet mean sea level (MSL) for that portion of <br />the project site located on the sand ridge. Mining <br />project sites that are large enough to fall within <br />St. Johns River Water Management District (SJRWMD) <br />permitting requirements shall conform to SJRWMD <br />permitting requirements concerning depth of mining <br />and all other applicable SJRWMD permitting <br />requirements. <br />(e) If the project site is adjacent to a residentially <br />zoned area, the perimeter of the site abutting such <br />an area shall include a fifty -foot wide bufferyard <br />and a type "A" buffer along said site boundary. <br />(f) No crusher, mixing plant, bin, tank, or structure <br />directly involved in the production process shall <br />be located less than six hundred (600) feet from <br />any adjacent residentially zoned property, -and two <br />hundred fifty (250) feet from all other adjacent <br />non -residentially zoned property. <br />(g) Hard rock mining activities shall ensure that <br />measures are taken to control dust. <br />(h) The Indian River County Planning and Zoning <br />Commission shall, upon approval of the mining site <br />plan, order issuance of an operating permit to the <br />owner of the land under his signature, and such <br />permit shall be issued within ten (10) days after <br />the determination of compliance by the commission. <br />(i) Provisions for continuing operation. Nothing <br />herein shall be construed as a requirement that an <br />operator of an existing sand mine shall cease <br />operations until a mining site plan has been <br />approved, providing a mining site plan has been <br />Dreviously aDDroved and maintained. <br />(j) The planning and zoning commission shall approve a <br />reasonable timetable for the completion of all <br />mining activities, including restoration. <br />48 <br />MAY 319 1995 <br />